Initial operation
KE/KX/KG (RIGID) BAH0089-7 02.2020
95
1. Couple the soil tillage implement to the tractor.
2. Secure the tractor and implement against unintentional start-up
and rolling.
3. Clean and grease the tractor PTO shaft and the implement's
gearbox input shaft.
4. Fix the two universal joint shaft halves to the tractor PTO shaft
and the gearbox input shaft.
Do not interconnect the universal joint shaft halves.
Observe the operating manual from the universal joint shaft
manufacturer.
5. Raise and lower the implement.
To do so, actuate the control valves at the rear of the tractor.
6. Before entering the danger area between the tractor and
implement, secure the raised implement against unintentional
lowering, by supporting it or hooking it to a crane.
7. Determine the shortest and longest operating position for the
universal joint shaft by holding the universal joint shaft halves
next to each other.
8. If necessary, have the universal joint shaft shortened in a
specialist workshop. Observe the operating manual from the
universal joint shaft manufacturer.
The safety devices and guards of the extended universal joint shaft
must overlap by at least 50 mm.
WARNING
Never actuate the operator controls for the tractor's three-point
hydraulic system while you are in the danger area between the
tractor and implement.
Содержание KE 2501 Special
Страница 71: ...Structure and function KE KX KG RIGID BAH0089 7 02 2020 71 Fig 43...
Страница 167: ...Cleaning maintenance and repair KE KX KG RIGID BAH0089 7 02 2020 167 12 16 Hydraulic diagram Fig 188...
Страница 171: ...Cleaning maintenance and repair KE KX KG RIGID BAH0089 7 02 2020 171...
Страница 172: ...Notes 172 KE KX KG RIGID BAH0089 7 02 2020 13 Notes Space for your notes...
Страница 173: ...Notes KE KX KG RIGID BAH0089 7 02 2020 173...