Loading and unloading
KE/KX/KG (RIGID) BAH0089-7 02.2020
33
3
Loading and unloading
The pictogram marks the location at which the
lifting gear is to be secured to the implement.
Fig. 2
DANGER
Only attach the lifting gear at the
marked location.
Do not stand under suspended
loads.
Loading the implement on a transport vehicle
1. Uncouple the seed drill and deep loosener
from the soil tillage implement.
2. Attach the lifting gear at the marked
location.
3. Place the implement on the transport
vehicle and lash it down as prescribed.
Fig. 3
Содержание KE 2501 Special
Страница 71: ...Structure and function KE KX KG RIGID BAH0089 7 02 2020 71 Fig 43...
Страница 167: ...Cleaning maintenance and repair KE KX KG RIGID BAH0089 7 02 2020 167 12 16 Hydraulic diagram Fig 188...
Страница 171: ...Cleaning maintenance and repair KE KX KG RIGID BAH0089 7 02 2020 171...
Страница 172: ...Notes 172 KE KX KG RIGID BAH0089 7 02 2020 13 Notes Space for your notes...
Страница 173: ...Notes KE KX KG RIGID BAH0089 7 02 2020 173...