Use of the implement
KE/KX/KG (RIGID) BAH0089-7 02.2020
133
10.1
Filling the hopper (optional)
Observe the corresponding operating manuals when using the im-
plement with the GreenDrill catch crop seeding unit!
1. Switch off the control terminal.
2. Unlock the ascent (Fig. 140/1) and swivel it
down (Fig. 140/2). Use the step of the lad-
der as handle.
3. To fill and adjust the GreenDrill, use the
existing loading board (Fig. 141/1).
Fig. 140
4. The seed hopper cover has a threaded seal
(Fig. 141/2).
5. Open the seed hopper cover and slowly fill
the seed hopper. Do not exceed the
nominal volume.
6. Screw on the seed hopper cover so that the
seed hopper is closed air-tight.
7. To prevent collisions, the ladder should
always be folded up when it is not in use,
e.g. during operation and before road
transport.
Fig. 141
Содержание KE 2501 Special
Страница 71: ...Structure and function KE KX KG RIGID BAH0089 7 02 2020 71 Fig 43...
Страница 167: ...Cleaning maintenance and repair KE KX KG RIGID BAH0089 7 02 2020 167 12 16 Hydraulic diagram Fig 188...
Страница 171: ...Cleaning maintenance and repair KE KX KG RIGID BAH0089 7 02 2020 171...
Страница 172: ...Notes 172 KE KX KG RIGID BAH0089 7 02 2020 13 Notes Space for your notes...
Страница 173: ...Notes KE KX KG RIGID BAH0089 7 02 2020 173...