Table of Contents
KE/KX/KG (RIGID) BAH0089-7 02.2020
7
6.2
Securing the tractor/implement against unintentional start-up and rolling ............................. 93
6.3
Attachment of the wheel mark eradicators ............................................................................ 94
6.4
Adjusting the length of the universal joint shaft to the tractor (specialist workshop) ............. 94
6.5
Fitting the coupling parts (specialist workshop) ..................................................................... 96
6.6
Attaching the lifting frame (specialised workshop) ................................................................. 97
6.6.1
Attaching lifting frame 2.2 (specialist workshop) .................................................................... 98
6.6.2
Installing lifting frame 3.2 (specialist workshop) .................................................................... 99
6.6.3
Fitting the lift height limiter (specialist workshop) ................................................................ 100
7
Coupling and uncoupling the implement .............................................. 101
7.1
Coupling the implement ....................................................................................................... 103
7.2
Uncoupling the implement ................................................................................................... 105
7.3
Coupling the mounted seed drill .......................................................................................... 106
7.3.1
Attaching the seed drill with the coupling parts .................................................................... 106
7.3.2
Attaching the seed drill to the lifting frame ........................................................................... 108
7.4
GreenDrill supply line ........................................................................................................... 110
7.5
Hydraulic hose lines ............................................................................................................. 110
7.5.1
Coupling the hydraulic hose lines ........................................................................................ 111
7.5.1.1
On lifting frame ..................................................................................................................... 112
7.5.1.2
On soil tillage implement ...................................................................................................... 112
7.5.2
Uncoupling the hydraulic hose lines .................................................................................... 112
8
Settings ..................................................................................................... 113
8.1
Adjusting the working depth ................................................................................................. 114
8.1.1
Mechanical adjustment ........................................................................................................ 114
8.1.2
Hydraulic adjustment (optional) ........................................................................................... 115
8.2
Adjusting the side panel ....................................................................................................... 116
8.2.1
Side plate KE Super / KX / KG............................................................................................. 116
8.2.1.1
Vertical adjustment .............................................................................................................. 116
8.2.1.2
Adjusting the spring tension ................................................................................................. 116
8.2.2
Side plate KE Special .......................................................................................................... 117
8.2.2.1
Vertical adjustment .............................................................................................................. 117
8.2.2.2
Adjusting the spring tension ................................................................................................. 117
8.3
Adjusting the soil guiding angle bracket (optional) .............................................................. 117
8.4
Adjusting the wheel mark eradicator (optional) .................................................................... 118
8.4.1
Exceeding the maximum working depth .............................................................................. 120
8.5
Adjusting the roller scraper .................................................................................................. 121
8.5.1
Wedge ring roller KW / KWM ............................................................................................... 122
8.5.2
Tooth packer roller PW ........................................................................................................ 122
8.5.3
TRW trapeze ring roller ........................................................................................................ 122
8.6
Adjusting the levelling board ................................................................................................ 123
8.6.1
Setting with decentralised levelling board adjustment ......................................................... 124
8.7
Transport locking mechanism for lifting frame (all types) ................................................... 125
8.7.1
Locking the lifting frame ....................................................................................................... 125
8.7.2
Unlocking the lifting frame .................................................................................................... 125
8.8
Adjusting the lift height limiter .............................................................................................. 126
8.9
Deactivating the lift height limiter ......................................................................................... 126
8.10
Adjusting the track marker ................................................................................................... 127
9
Transportation ......................................................................................... 128
9.1
Moving the implement in the transport position ................................................................... 130
9.2
Transporting with a transport vehicle ................................................................................... 130
10
Use of the implement ............................................................................... 131
10.1
Filling the hopper (optional) ................................................................................................. 133
10.2
On the field ........................................................................................................................... 134
10.2.1
Work commencement .......................................................................................................... 134
10.2.2
Moving the wheel mark eradicator into working position ..................................................... 134
Содержание KE 2501 Special
Страница 71: ...Structure and function KE KX KG RIGID BAH0089 7 02 2020 71 Fig 43...
Страница 167: ...Cleaning maintenance and repair KE KX KG RIGID BAH0089 7 02 2020 167 12 16 Hydraulic diagram Fig 188...
Страница 171: ...Cleaning maintenance and repair KE KX KG RIGID BAH0089 7 02 2020 171...
Страница 172: ...Notes 172 KE KX KG RIGID BAH0089 7 02 2020 13 Notes Space for your notes...
Страница 173: ...Notes KE KX KG RIGID BAH0089 7 02 2020 173...