![Amazone Ceus 3000-TX Скачать руководство пользователя страница 83](http://html1.mh-extra.com/html/amazone/ceus-3000-tx/ceus-3000-tx_original-operating-manual_2919739083.webp)
Repairing the implement
10
10.1 Maintaining the implement
10.1.1 Maintenance schedule
After initial operation
Checking the disc carrier connection
Checking the levelling connection
Checking the rollers
Checking the hydraulic hose lines
as required
Replacing the discs
Aligning the disc gangs relative to each other
Replacing tines with compression spring overload
safety
Replacing C-Mix-3 coulters
Replacing the C-Mix-3 Clip coulter
daily
Checking the compressed air tank
Every 12 months
Checking the disc carrier rubber O-rings
Every 50 operating hours
Checking the lower link hitch
CMS-T-00006923-E.1
CMS-T-00006922-E.1
10 | Repairing the implement
MG7242-EN-GB | L.1 | 26.07.2022 | © AMAZONE
77