![Amazone Ceus 3000-TX Скачать руководство пользователя страница 90](http://html1.mh-extra.com/html/amazone/ceus-3000-tx/ceus-3000-tx_original-operating-manual_2919739090.webp)
10.1.11 Checking the rollers
INTERVAL
After initial operation
Every 200 operating hours
or
Every 3 months
Check the bolts
1
for tightness.
If the bolts need to be replaced,
pay attention to the alignment of the bolts.
Check the roller bearing
2
for ease of
movement.
2
2
1
1
CMS-I-00000099
10.1.12 Checking the lower link pins
INTERVAL
Every 500 operating hours
or
Every 6 months
1.
Check the lower link pins for cracks or broken
areas.
2.
Replace the pins if there is significant wear.
10.1.13 Checking the hydraulic hose lines
INTERVAL
After initial operation
Every 50 operating hours
or
weekly
1.
Check the hydraulic hose lines for damage, such
as chafing point, cuts, tears and deformation.
2.
Check the hydraulic hose lines for leaks.
CMS-T-00002329-D.1
CMS-T-00004233-B.1
CMS-T-00002331-C.1
10 | Repairing the implement
Maintaining the implement
MG7242-EN-GB | L.1 | 26.07.2022 | © AMAZONE
84