
31
5. Maintenance
(continue)
Be sure to read and understand on the page 3 to 7 “For safety operation” carefully before use
Error cancellation
When an error code is displayed, accompanied by an operation stop,
remove the cause of the stop, press the RESET button, and then restart
the operation. If the operation is resumed without eliminating the cause of
the stop, it should lead to occurrence of a malfunction, accident, fire, and
other failures.
If the set time for maintenance is reached, the CHECK lamps turn on. At this time (with the CHECK lamp
lit), if the operation is once stopped, restart will not take place unless the RESET button is pressed.
(Only
the CHECK lamp lights in the external operation mode.) Inspect the electrodes, clean and make
replacement at need. Confirm their freedom of fault, reinstall them and press the RESET button. This
allows resetting of the maintenance timer, enabling restart of the operation.
The operation can also be restarted even with the cause of
the stop left as it has been, by pressing the reset button.
However, such handling should only be admitted as a
temporary emergency measure and never be practiced as a
permanent measure.
Caution
Before pressing the RESET button to restart the operation
after the maintenance, inspect the reinstalled electrodes once
again to ensure they are free from defects or faults.
Caution
Содержание EM-e II
Страница 51: ...50 9 External dimensions EM 15eⅡ unit mm ...
Страница 52: ...51 9 External dimensions continue EM 30eⅡ unit mm ...
Страница 53: ...52 10 Wiring diagrams ...
Страница 55: ......
Страница 56: ...NFG 930203 27 Printed in Japan T9712A Yokohama Japan http www amano co jp English ...