
19
4.
Operation
(continue)
Be sure to read and understand on the page 3 to 7 “For safety operation” carefully before use
Connecting the wires for the external operation
(continue)
●
3
Wiring the signal wire
Wire the signal wire along the shape of inside of the inspection door like other wiring.
Bundle the signal wire using a union band etc. at this time. Thread the tied signal wires
through slit grommet by the side of a inspection door and electrical equipment.
Connect the tied signal wires each terminal block.
(Refer to Procedure (4) and Procedure (5) for the connection method.)
Signal wire
Wire the signal wire
passed into the electric
part to each terminal box.
Destination terminal BOX
Slit the grommet
and let the tied
signal wire pass
to the electric
part.
<
The NG example>
The act such as hooking the tied
signal wire on the convex portion (L
character portion) of the check
door, or shutting a check door with
the condition with the wire inserted
into the hinge.
Bundle the signal wire
together with other cables
using a union band etc.
Moreover, when you shut
a check door, please shut
carefully not to crush on
both sides of the tied
signal wire between a
inspection door and this
electrical equipment.
Hinge
Содержание EM-e II
Страница 51: ...50 9 External dimensions EM 15eⅡ unit mm ...
Страница 52: ...51 9 External dimensions continue EM 30eⅡ unit mm ...
Страница 53: ...52 10 Wiring diagrams ...
Страница 55: ......
Страница 56: ...NFG 930203 27 Printed in Japan T9712A Yokohama Japan http www amano co jp English ...