
CHAPTER 4: OPERATING INSTRUCTIONS
125ADP/300ADP/1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY
990-922
4-9
Extended Shut-down Procedure
If the ADP unit has been turned off and non-operational for a period of 3 months or longer, an extended
warm-up sequence is recommended.
1.
Turn the unit ON.
2.
Set the energy to the maximum level.
Example:
set the 1000ADP to 999 Watt Seconds.
3.
Fire the unit once.
4.
Leave the power ON and wait 15 minutes.
5.
Program the desired schedule and resume normal operation.
Содержание 1000ADP
Страница 1: ...990 922 Rev G STORED ENERGY POWER SUPPLY 125 300 1000ADP OPERATION MANUAL...
Страница 8: ...125ADP 300ADP 1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY viii 990 922...
Страница 9: ...125ADP 300ADP 1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY 990 922 ix...
Страница 14: ......
Страница 24: ......
Страница 58: ......
Страница 64: ......
Страница 82: ......
Страница 92: ......
Страница 112: ...AMADA MIYACHI AMERICA INC 1820 South Myrtle Ave Monrovia CA 91016 U S A TEL 1 626 303 5676 FAX 1 626 358 8048...