
CHAPTER 2: INSTALLATION AND SETUP
125ADP/300ADP/1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY
2-4
990-922
Section II: 125ADP & 300ADP
External Equipment Connections
All connections between the Power Supply and external equipment other than the weld cable are made
through the rear panel.
Rear Panel Components and Connectors 125ADP and 300ADP
NOTE:
Weld cable connections are made at the front panel for the 125ADP and 300ADP
Power Supplies and located on the front panel of the external transformer on the 1000ADP
systems.
Emergency STOP Switch
Connect an agency compliant, normally closed,
EMERGENCY STOP SWITCH
across the two leads of the
emergency stop switch connector cable. This switch, when operated (open), will immediately stop the
weld cycle. See
Appendix B. Electrical and Data Connections
for circuit details.
NOTE:
For operation
without
an
EMERGENCY STOP SWITCH
, verify that the two conductors of the
emergency stop cable are shorted together as the system will not operate with this loop electrically open.
Содержание 1000ADP
Страница 1: ...990 922 Rev G STORED ENERGY POWER SUPPLY 125 300 1000ADP OPERATION MANUAL...
Страница 8: ...125ADP 300ADP 1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY viii 990 922...
Страница 9: ...125ADP 300ADP 1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY 990 922 ix...
Страница 14: ......
Страница 24: ......
Страница 58: ......
Страница 64: ......
Страница 82: ......
Страница 92: ......
Страница 112: ...AMADA MIYACHI AMERICA INC 1820 South Myrtle Ave Monrovia CA 91016 U S A TEL 1 626 303 5676 FAX 1 626 358 8048...