Full Height Tandem Installation Instructions
Page 24 [email protected] +1(909) 591-8431 www.alvaradomfg.com
Installation Instructions
Post-Installation Checklist
1
Electrical
Validate that electrical connections meet local code requirements.
2
Operation
Validate Key Override Operation.
Ensure Key Overrides are in proper operational position.
Validate turnstile operation in conjunction with the installed access system. Perform multiple activations
and rotations in each direction.
Ensure that desired outputs are attached and operational.
3
Attachment
Check that mounting bolts and screws are secure and tightened per the requirements in this manual.
Top and bottom bearing covers are installed.
Top channel cover is in place.
4
Finish
Stainless Steel (Uncoated) – wipe down the entire turnstile with clean water or use the Alvarado
recommended commercial products (see Cleaning and Maintenance Section).
Stainless Steel (units with optional coating) – wipe down entire turnstile with clean water.
Hot Dipped Galvanized – wipe down the stainless steel Top Channel as indicated above. Repair
any damaged galvanized areas with zinc-rich paint following the manufacturer’s instructions. An
explanatory document describing the ASTM recommended repair process is available from the American
Galvanizer Association website.
Powdercoated - wipe down entire turnstile with clean water. Repair areas that may have been
damaged during the installation process. Touch up paint can be purchased from Alvarado.
Acrylic - wipe down acrylic surfaces with Alvarado recommended commercial products (see Cleaning
and Maintenance Section).
5
User Instructions
Train responsible personnel on turnstile operation.
Provide the User Activation and Passage Instructions contained in this manual to responsible personnel.
6
Manual Handoff
Provide this manual to responsible personnel.