Full Height Tandem Installation Instructions
Installation Instructions [email protected] +1(909) 591-8431 www.alvaradomfg.com
Page 13
Mounting
Nuts
OV Installation (Cont)
1.
Gently slide the OV between the two installed Rotos
(Figure 17).
NOTES
Each Roto may need to be slightly rotated while installing the OV. See "Key Override" section if the Roto will not
rotate.
When sliding the OV into place, the Top Channel may need to be raised slightly.
2.
Align the two mounting holes on the OV with the two mounting holes on the Top Channel.
3.
Insert and hand tighten two 1½" mounting bolts and two mounting nuts up through the mounting holes
(Figure 17A).
4.
Use a pencil and mark the center of all four anchoring holes on both base plates, eight total (Figure 17B).
Illustration shown without installed Yokes.
View from underside of Top Channel / OV.
1½" Mounting
Bolts
Mounting
Nuts
Top Channel
Top of OV
Roto
Fig. 17
17A
17B