Full Height Tandem Installation Instructions
Page 12 [email protected] +1(909) 591-8431 www.alvaradomfg.com
Installation Instructions
Top Channel Installation (Cont)
Fig. 15
7.
The Top Channel mounting holes are located at each end of the Top Channel (Figure 15).
A. Yoke - Insert four ½" x 2¾" hex head bolts, from the underside of the Top Channel, up through the mounting
holes and secure with four ½" lock washers and four ½" nuts (Figure 15A).
8.
Hand tighten the Top Channel mounting hardware at this time.
Fig. 16
13 Rungs
12 Rungs
As viewed from the unsecured/entry side.
NOTE
For MSTT and CLSTT models, the OV must
be installed with 12 rungs facing the right side
and 13 rungs the left side (as viewed from the
unsecured/entry side; Figure 16).
For the CPSTT, the OV must be installed
with 10 rungs facing the right side and 11
rungs facing the left side (as viewed from the
unsecured/entry side; Figure 16).
11 Rungs
10 Rungs
MSTT / CLSTT
CPSTT
OV Installation
15A