Contents
6
SBx Linecard Status LEDs............................................................................................................................... 65
Console (RS-232) Port..................................................................................................................................... 66
Ethernet Management Port (NET MGMT) ....................................................................................................... 67
USB Port .......................................................................................................................................................... 69
Reset Button .................................................................................................................................................... 70
AlliedWare Plus Software Releases for the Hardware Components ............................................................... 72
Reviewing Safety Precautions ......................................................................................................................... 74
Selecting a Site for the SwitchBlade x8112 ..................................................................................................... 78
Installation Tools and Material ......................................................................................................................... 80
Required Tools and Material ............................................................................................................................ 82
Preparing the Equipment Rack ........................................................................................................................ 83
Unpacking the AT-SBx8106 Chassis ............................................................................................................... 86
Removing the Rubber Feet .............................................................................................................................. 88
Adjusting the Equipment Rack Brackets .......................................................................................................... 90
Installing the Chassis in the Equipment Rack .................................................................................................. 92
Removing the Shipping Brace ......................................................................................................................... 96
Installing the Chassis Grounding Wire ............................................................................................................. 97
Protecting Against Electrostatic Discharge (ESD) ......................................................................................... 100
Installing AT-SBxPWRSYS1 or AT-SBxPWRSYS2 AC System Power Supplies.......................................... 101
Installing AT-SBxPWRPOE1 PoE Power Supplies........................................................................................ 107
Installing AT-SBxPWRSYS1 DC System Power Supplies............................................................................. 112
Guidelines to Handling the Controller and Line Cards ................................................................................... 120
Installing the AT-SBx81CFC400 Controller Fabric Card................................................................................ 122
Installing the Ethernet Line Cards .................................................................................................................. 128
Installing the Blank Slot Covers ..................................................................................................................... 132
Guidelines to Installing SFP and SFP+ Transceivers .................................................................................... 139
Installing SFP Transceivers in the AT-SBx81GS24a Line Card .................................................................... 140
Installing SFP+ Transceivers in the AT-SBx81XS6 Line Card....................................................................... 144
Installing AT-SP10TW Cables in the AT-SBx81XS6 Line Card ..................................................................... 148
Cabling the NET MGMT Port on the AT-SBx81CFC400 Card....................................................................... 150
Verifying the Installation ................................................................................................................................. 154
Powering On the AT-SBxPWRSYS1 or AT-SBxPWRSYS2 AC Power Supply ............................................. 155
Powering On the AT-SBxPWRPOE1 Power Supply...................................................................................... 158
Powering On the AT-SBxPWRSYS1 DC System Power Supply ................................................................... 161
Choosing a Method for Attaching the Grounding Wire ............................................................................ 163
Connecting the Grounding Wire with the Grounding Terminal ................................................................ 163
Connecting the Grounding Wire with Bare Wire...................................................................................... 166
Choosing a Method for Attaching the Power Wires................................................................................. 168
Connecting the DC Power Wires with the Straight Terminals ................................................................. 168
Connecting the DC Power Wires with the Right Angle Terminals ........................................................... 177
Connecting Bare DC Power Wires .......................................................................................................... 183
Содержание AT-SBx8
Страница 8: ...Contents 8...
Страница 12: ...List of Figures 12...
Страница 14: ...List of Tables 14...
Страница 18: ...Preface 18...
Страница 32: ...Chapter 1 Chassis and Power Supplies 32...
Страница 118: ...Chapter 6 Installing the Power Supplies 118...
Страница 134: ...Chapter 7 Installing the AT SBx81CFC400 Controller and Ethernet Line Cards 134...
Страница 152: ...Chapter 8 Installing the Transceivers and Cabling the Ports 152...
Страница 190: ...Chapter 9 Powering On the Chassis 190...
Страница 212: ...Chapter 11 Troubleshooting 212...
Страница 230: ...Chapter 12 Replacing Modules 230 Figure 146 Lowering the Locking Handle on the Power Supply Slot Cover...