SwitchBlade x8106 Chassis Switch and AT-SBx81CFC400 Card Installation Guide
109
Figure 49. Items Included with the AT-SBxPWRPOE1 Power Supply
Module
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
Note
The tie wrap is used to secure the power cord to the chassis in
“Powering On the AT-SBxPWRPOE1 Power Supply” on page 158.
4. Raise the locking handle on the AT-SBxPWRPOE1 Power Supply, as
One AT-SBxPWRPOE1
Power Supply Module
One regional AC power cord
One tie wrap
Содержание AT-SBx8
Страница 8: ...Contents 8...
Страница 12: ...List of Figures 12...
Страница 14: ...List of Tables 14...
Страница 18: ...Preface 18...
Страница 32: ...Chapter 1 Chassis and Power Supplies 32...
Страница 118: ...Chapter 6 Installing the Power Supplies 118...
Страница 134: ...Chapter 7 Installing the AT SBx81CFC400 Controller and Ethernet Line Cards 134...
Страница 152: ...Chapter 8 Installing the Transceivers and Cabling the Ports 152...
Страница 190: ...Chapter 9 Powering On the Chassis 190...
Страница 212: ...Chapter 11 Troubleshooting 212...
Страница 230: ...Chapter 12 Replacing Modules 230 Figure 146 Lowering the Locking Handle on the Power Supply Slot Cover...