Chapter 12: Replacing Modules
234
Note
You should not replace a controller card in a chassis that has two
controller cards while the unit is powered off, especially if you are
replacing a failed controller card in slot 5. If you replace a failed
controller card while the chassis is powered off, the Ethernet line
cards might lose their configurations if the new controller card is
designated as the active card when you power on the chassis.
2. Remove the failed controller card. Refer to the instructions in this
section.
3. Install the new controller card. For instructions, refer to “Installing the
AT-SBx81CFC400 Controller Fabric Card” on page 122.
To remove a controller card from the chassis, perform the following
procedure:
1. Disconnect the cables from the NET MGMT and Console ports on the
controller card.
2. Use a #2 Phillips-head screwdriver to loosen the two screws on the
faceplate of the card.
3. Carefully pull out the handles of the faceplate to disconnect the
controller card from the connector on the backplane of the chassis.
4. Carefully slide the controller card from the chassis.
Caution
Keep the card level as you slide it out of the chassis. You might
damage the components on the top or bottom of the card if you slide
it out at an angle. Refer to Figure 60 on page 121.
5. Do one of the following:
For instructions on how to install a new controller card in the
chassis, refer to “Installing the AT-SBx81CFC400 Controller Fabric
Card” on page 122.
If you do not plan to immediately install another controller card in
the slot, cover the slot with a blank cover. For instructions, refer to
“Installing the Blank Slot Covers” on page 132.
If you do not plan to immediately install the controller card in
another chassis, continue with this procedure.
6. Store the controller card in an anti-static bag.
7. Return the card to its shipping container.
Содержание AT-SBx8
Страница 8: ...Contents 8...
Страница 12: ...List of Figures 12...
Страница 14: ...List of Tables 14...
Страница 18: ...Preface 18...
Страница 32: ...Chapter 1 Chassis and Power Supplies 32...
Страница 118: ...Chapter 6 Installing the Power Supplies 118...
Страница 134: ...Chapter 7 Installing the AT SBx81CFC400 Controller and Ethernet Line Cards 134...
Страница 152: ...Chapter 8 Installing the Transceivers and Cabling the Ports 152...
Страница 190: ...Chapter 9 Powering On the Chassis 190...
Страница 212: ...Chapter 11 Troubleshooting 212...
Страница 230: ...Chapter 12 Replacing Modules 230 Figure 146 Lowering the Locking Handle on the Power Supply Slot Cover...