153
Chapter 9
Powering On the Chassis
This chapter describes how to power on the chassis and monitor the
initialization process. The chapter contains the following sections:
“Verifying the Installation” on page 154
“Powering On the AT-SBxPWRSYS1 or AT-SBxPWRSYS2 AC Power
Supply” on page 155
“Powering On the AT-SBxPWRPOE1 Power Supply” on page 158
“Powering On the AT-SBxPWRSYS1 DC System Power Supply” on
page 161
Содержание AT-SBx8
Страница 8: ...Contents 8...
Страница 12: ...List of Figures 12...
Страница 14: ...List of Tables 14...
Страница 18: ...Preface 18...
Страница 32: ...Chapter 1 Chassis and Power Supplies 32...
Страница 118: ...Chapter 6 Installing the Power Supplies 118...
Страница 134: ...Chapter 7 Installing the AT SBx81CFC400 Controller and Ethernet Line Cards 134...
Страница 152: ...Chapter 8 Installing the Transceivers and Cabling the Ports 152...
Страница 190: ...Chapter 9 Powering On the Chassis 190...
Страница 212: ...Chapter 11 Troubleshooting 212...
Страница 230: ...Chapter 12 Replacing Modules 230 Figure 146 Lowering the Locking Handle on the Power Supply Slot Cover...