SwitchBlade x8106 Chassis Switch and AT-SBx81CFC400 Card Installation Guide
155
Powering On the AT-SBxPWRSYS1 or AT-SBxPWRSYS2 AC Power
Supply
The procedure in this section explains how to power on the AT-
SBxPWRSYS1 or AT-SBxPWRSYS2 AC Power Supplies in slots C and D
on the front panel. If you have not installed the power supplies, refer to
“Installing AT-SBxPWRSYS1 or AT-SBxPWRSYS2 AC System Power
Supplies” on page 101 for installation instructions.
Note
If the chassis has both system and PoE power supplies, you may
power them on in any order or simultaneously.
Caution
If the chassis has two AT-SBxPWRSYS2 Power Supplies, you must
power them on within 90 seconds of each other. Otherwise, the
active master controller card might restart its operating software,
which will delay the initialization process of the chassis.
To power on the AC system power supplies, perform the following
procedure:
1. Identify AC sockets C and D in the recessed panel on the back panel
of the chassis, shown in Figure 91. These sockets are for the AC
system power supplies in slots C and D on the front panel of the
chassis.
Figure 91. AC Sockets on the Rear Panel of the AT-SBx8106 Chassis
A
D
C
B
Содержание AT-SBx8
Страница 8: ...Contents 8...
Страница 12: ...List of Figures 12...
Страница 14: ...List of Tables 14...
Страница 18: ...Preface 18...
Страница 32: ...Chapter 1 Chassis and Power Supplies 32...
Страница 118: ...Chapter 6 Installing the Power Supplies 118...
Страница 134: ...Chapter 7 Installing the AT SBx81CFC400 Controller and Ethernet Line Cards 134...
Страница 152: ...Chapter 8 Installing the Transceivers and Cabling the Ports 152...
Страница 190: ...Chapter 9 Powering On the Chassis 190...
Страница 212: ...Chapter 11 Troubleshooting 212...
Страница 230: ...Chapter 12 Replacing Modules 230 Figure 146 Lowering the Locking Handle on the Power Supply Slot Cover...