15
Preface
This guide contains the hardware installation instructions for the Layer 3+
SwitchBlade x8106 Chassis Switch. The preface contains the following
sections:
“Safety Symbols Used in this Document” on page 16
“Contacting Allied Telesis” on page 17
Note
This version of the installation guide applies to release 5.4.5-1 of the
AlliedWare Plus
™
Operating System for the SwitchBlade x8106
Chassis Switch and AT-SBx81CFC400 Controller Fabric Card.
Содержание AT-SBx8
Страница 8: ...Contents 8...
Страница 12: ...List of Figures 12...
Страница 14: ...List of Tables 14...
Страница 18: ...Preface 18...
Страница 32: ...Chapter 1 Chassis and Power Supplies 32...
Страница 118: ...Chapter 6 Installing the Power Supplies 118...
Страница 134: ...Chapter 7 Installing the AT SBx81CFC400 Controller and Ethernet Line Cards 134...
Страница 152: ...Chapter 8 Installing the Transceivers and Cabling the Ports 152...
Страница 190: ...Chapter 9 Powering On the Chassis 190...
Страница 212: ...Chapter 11 Troubleshooting 212...
Страница 230: ...Chapter 12 Replacing Modules 230 Figure 146 Lowering the Locking Handle on the Power Supply Slot Cover...