SwitchBlade x8106 Chassis Switch and AT-SBx81CFC400 Card Installation Guide
83
Preparing the Equipment Rack
This section explains how to prepare the equipment rack for the chassis.
The procedure requires the following items:
#2 Phillips-head screwdriver (not provided)
Two equipment rack screws (not provided)
To prepare the equipment rack for the AT-SBx8106 Chassis, perform the
following procedure:
Caution
The chassis is heavy and should be mounted as low as possible in
the equipment rack to maximize vertical stability.
1. Reserve 190.0 mm (7.5“) of vertical rack space for the installation of
the AT-SBx8106 Chassis, as shown in Figure 25 on page 84.
2. Do not mount any equipment within 152.4 mm (6”) above this space
during installation. This additional vertical space is temporary and
allows you enough room to lift and tilt the chassis into its position in the
equipment rack without striking other equipment. You may use this
additional space for other network equipment after the chassis is
installed.
Содержание AT-SBx8
Страница 8: ...Contents 8...
Страница 12: ...List of Figures 12...
Страница 14: ...List of Tables 14...
Страница 18: ...Preface 18...
Страница 32: ...Chapter 1 Chassis and Power Supplies 32...
Страница 118: ...Chapter 6 Installing the Power Supplies 118...
Страница 134: ...Chapter 7 Installing the AT SBx81CFC400 Controller and Ethernet Line Cards 134...
Страница 152: ...Chapter 8 Installing the Transceivers and Cabling the Ports 152...
Страница 190: ...Chapter 9 Powering On the Chassis 190...
Страница 212: ...Chapter 11 Troubleshooting 212...
Страница 230: ...Chapter 12 Replacing Modules 230 Figure 146 Lowering the Locking Handle on the Power Supply Slot Cover...