Chapter 5: Installing the Chassis in an Equipment Rack
90
Adjusting the Equipment Rack Brackets
The chassis has two pre-installed equipment rack brackets. You may
adjust the brackets so that the front of the chassis is flush with, extends
beyond, or is recessed behind the front of the equipment rack. You may
also install the brackets so that the rear panel of the chassis is flush with
the front of the equipment rack.
You adjust the brackets by removing them and re-installing them in
different positions on the sides of the chassis. The bracket positions are
listed in Table 20 and illustrated in Figure 31 on page 91 and Figure 32 on
page 91. Please review the following information before moving the
brackets:
Position A, the default position, positions the chassis so that the
front of the unit is flush with the front of the equipment rack.
Position B recesses the front of the chassis by 27.39 mm (1.1 in).
Positions C to E extend the front of the chassis beyond the front of
the rack from 27.39 mm (1.1 in) to 140.85 mm (5.545 in).
Position F installs the chassis with the rear panel flush with the
front of the equipment rack.
To install the rack mount brackets in position “E,” you have to
remove the two chassis screws from the bottom-middle section of
the chassis and re-install them in front where the rack mount
bracket screws were originally, as shown in Figure 31 on page 91.
The dimension (X) between the front panel and the rack rails is
given for each rack mounting bracket position in Table 20.
Table 20. Front Panel to Rack Rail Dimensions
Figure #
Front Panel Position
Dimension X
Front Panel to Rack Rail
A
(Factory Installed - Flush)
3.69 mm (0.145 in)
B
(Recessed)
-27.39 mm (-1.078 in)
C
27.39 mm (1.078 in)
D
47.71 mm (1.878 in)
E
140.85 mm (5.545 in)
F
(Reverse Position)
374.16 mm (14.731 in)
Содержание AT-SBx8
Страница 8: ...Contents 8...
Страница 12: ...List of Figures 12...
Страница 14: ...List of Tables 14...
Страница 18: ...Preface 18...
Страница 32: ...Chapter 1 Chassis and Power Supplies 32...
Страница 118: ...Chapter 6 Installing the Power Supplies 118...
Страница 134: ...Chapter 7 Installing the AT SBx81CFC400 Controller and Ethernet Line Cards 134...
Страница 152: ...Chapter 8 Installing the Transceivers and Cabling the Ports 152...
Страница 190: ...Chapter 9 Powering On the Chassis 190...
Страница 212: ...Chapter 11 Troubleshooting 212...
Страница 230: ...Chapter 12 Replacing Modules 230 Figure 146 Lowering the Locking Handle on the Power Supply Slot Cover...