BOSS – Installation, Operation and Maintenance Manual
A l e n c o n S y s t e m s L L C - P a g e
|
27
4. Set BOSS Direction – This command will decide if the BOSS is going to RUN from BATT to
BUS or from BUS to BATT.
Note: BOSS Default Setup considers the BUS as input and BATT as Output
5. Current Set-Point – this command sets the current required to be drawn from the source
6. Reset Modbus address to 247(Default) – This command resets the Modbus address of the
BOSS within a page to default. The customer would then have to re-define the Modbus
addresses of each DCDC using the “
metadata
” file available in the
HUB
folder. The file must
be edited using + or any other text editors
(contact Alencon for training on this)
.
Figure 17: Metadata File containing comm. details - Modbus address, GUID etc.