manualshive.com logo in svg
background image

EMBEDDED IPCS

INSTRUCTIONS FOR USE  | 

C6

 

P34 BOX

Original Manual

Document 20200909 EN 01

Содержание C6 P34 BOX Series

Страница 1: ...EMBEDDED IPCS INSTRUCTIONS FOR USE C6 P34 BOX Original Manual Document 20200909 EN 01...

Страница 2: ......

Страница 3: ...case of non observance of this safety instruction WARNING Dangerous situation which may cause death or serious injury in case of non observance of this safety instruction CAUTION Dangerous situation w...

Страница 4: ...well as any user specific advice in spoken and written and through tests are made to best of our knowledge and information about the intended use However they are regarded as being only informal and...

Страница 5: ...on 16 1 5 Start up and operation 16 1 6 Maintenance 16 1 8 Repair 17 1 7 Disposal 17 2 System Description 18 2 1 Highlights 18 2 1 1 Supported Operating Systems 18 2 1 2 Power Supply with galvanic iso...

Страница 6: ...r supply connection 37 3 9 5 Power supply assembly 37 3 9 6 Power on 39 3 9 6 1 Power supply LED 41 3 9 6 2 Rear on off standby LED 41 3 9 6 3 Fuse replacement factory only 41 4 Operating Systems 42 4...

Страница 7: ...rface 60 5 Mass storage and expansions 61 5 1 Mass storage 61 5 1 1 CFast 61 5 1 2 SSD mSATA 62 6 Maintenance and service 63 6 1 Removing the rear cover 63 6 2 Backup battery replacement 63 6 3 RAM in...

Страница 8: ...20 C6 P34 Box dimensions 32 Figure 21 Mounting installation detail 33 Figure 22 DIN guide installation detail 34 Figure 23 DIN guide installation detail 34 Figure 24 DIN guide installation detail 35 F...

Страница 9: ...ion removal 64 Figure 49 RAM installation removal 64 Figure 50 RAM installation removal 65 Figure 51 CFast Slot detail 65 Figure 52 CFast installation 65 Figure 53 CFast removal 66 Figure 54 CFast rem...

Страница 10: ...le 3 Rear on off standby LED 41 Table 4 User Accounts 42 Table 5 Volume protection 48 Table 6 C6 P34 Box Technical data 67 Table 7 C6 P34 Box Options 67 Table 8 Technical data 68 Table 9 Power supply...

Страница 11: ...ional Safety over Ethernet GND Reference potential ground Head mo dule Description for the bus coupler or small control in the KEB I O EtherCat system HMI Human machine interface touch screen IEC Inte...

Страница 12: ...e systems Part 1 Princi ples requirements and tests IEC 60664 1 EN60721 3 1 Classification of environmental conditions Part 3 1 Classification of groups of environmental parameters and their severitie...

Страница 13: ...8 1 7 Functional safety of electrical electronic programmable electronic safety related systems Part 1 7 VDE0803 1 7 IEC61508 1 7 EN61800 2 Adjustable speed electrical power drive systems Part 2 Gener...

Страница 14: ...sulting claims against the manufacturer NOTICE Hazards and risks through ignorance Read the instructions for use Observe the safety and warning instructions If anything is unclear please contact KEB A...

Страница 15: ...Mounting according to the specified degree of protection Make sure that no small parts fall into the device during assembly and wiring drilling chips screws etc This also applies to mechanical compone...

Страница 16: ...g exists between the components to be connected e g by the equipotential line Disregard can cause destruction of the components by equalizing currents 1 5 Start up and operation When the device is ins...

Страница 17: ...following table The corresponding KEB return addresses can be found on our website Withdrawal by WEEE Reg No Keyword Austria KEB Automation GmbH ERA 51976 Stichwort R cknahme WEEE France R CYLUM Recyc...

Страница 18: ...an isolated 24 VDC power supply input 2 1 Highlights Fanless Panel Box IPCs Oper ating temperature 0 50 KEB COMBIVIS CONNECT Win32 64 runtime included Intel Skylake H 35 45W platform Intel Core i5 644...

Страница 19: ...tning Power supply with grounded positive termi nal e g Japan Figure 1 Isolated Power Supply 2 1 3 KEB system identity Non volatile memory for system identification data storage Figure 2 Non volatile...

Страница 20: ...nds SSD memory due to its industrial reliability and high thermal and vibration shock resistance 2 1 6 Expansion slot add on The system can be optionally equipped with KEB design add on cards They pro...

Страница 21: ...BOX n 1 Power supply plug pre installed on the system n 1 Power supply cover Figure 6 Package 2 3 Rear area In the rear we find the following areas 2 1 3 4 5 6 1 GND area 2 Power supply 3 Buttons LED...

Страница 22: ...round screw 2 Power DC input 3 UPS status LED Figure 8 Power supply detail 2 3 2 Buttons LEDs detail 1 2 3 4 5 6 1 Watchdog Reset in preparation 2 Rest 3 On Off Standby UPS 4 HD LED 5 Temperature LED...

Страница 23: ...1000 Mbps 4 USB 1 2 2 0 5 USB 3 4 3 0 6 USB 5 3 0 7 DVI D 8 LAN2 10 100 1000 Mbps 9 BUS 10 100 1000 Mbps Figure 10 Connectors detail 2 3 4 Expansion detail 1 1 Expansion Figure 11 Expansion detail Th...

Страница 24: ...itry to electronic devices where the electronics itself or the user s application hosted by the devices is critical from the possibility of a sudden loose of power KEB Micro UPS is designed to be used...

Страница 25: ...r capacitors are ready and the peripherals are switched off see previous point The memory data block 128KB is copied the MRAM memory In case the super capacitors are not ready no data is saved to avoi...

Страница 26: ...re present 1 1 Label Figure 13 Label position detail 2 3 7 1 Marking label 1 2 3 4 5 6 7 1 Model 2 Material number 3 Bar code 4 CE marking 5 Electrical information 6 UL marking 7 Disposal Figure 14 Ma...

Страница 27: ...27 System Description 2 4 Rear view 1 2 3 1 Mounting seal 2 PC housing 3 Aeration holes Figure 16 Rear view 2 5 Side view 1 2 1 Aeration holes 2 CFast Slot Figure 17 Side view...

Страница 28: ...KEB representative Do not install parts that were damaged during the shipment 3 3 Checking the operating conditions Read carefully the standards approvals EMC parameters and technical specifi cations...

Страница 29: ...rom outside through at least two openings An opening should be placed under the PC cell it must be large enough to allow the correct air flow from outside that is required to be within the limits spec...

Страница 30: ...ry leaving the following open spaces around the system X direction 7 cm min for each side Y direction 10 cm min for each side Z direction 7 cm min Mounting the clamps requires a space at least 20 mm o...

Страница 31: ...ing the mounting In order to ensure a proper mounting of the system the material of the mounting must be sufficiently stable To obtain the degree of protection described below the material of the moun...

Страница 32: ...32 Installation and connection 3 8 Dimensions Figure 20 C6 P34 Box dimensions...

Страница 33: ...s follows Tool required Action Cross screwdriver 2 5 mm Screw unscrew n 4 fixing screws Drill the required holes on the housing panel wall according to the instructions detailed in paragraph dimension...

Страница 34: ...de as follows Tool required Action Cross screwdriver 2 5 mm Fix the special purpose bends to the system Fix the special purpose bends to the system as indicated in the picture Figure 22 DIN guide inst...

Страница 35: ...ions could be at a different potential level The data cable screens connecting the equipment s chassis on one end and the C6 P34 BOX chassis on the other end can therefore be subject to a high current...

Страница 36: ...to the equipotential bonding rail on both sides befo re connecting the cable to the interfaces 1 1 Ground screw On the rear locate the ground screw Figure 26 Grounding 1 2 3 4 5 1 Screw 2 Spring Washe...

Страница 37: ...rements of safe extra low voltage SELV in accordance with IEC EN DIN EN UL60950 1 Remove the two poles plug connector from the system Connect the positive and the negative poles also refer to the labe...

Страница 38: ...the picture Figure 30 Power connector assembly Place the two poles plug connector in the cup as shown in the picture Figure 31 Power connector assembly Tighten the cable tie Figure 32 Power connector...

Страница 39: ...p as shown in the picture Figure 34 Power connector assembly Example of a correctly installed cup Figure 35 Power connector assembly 3 9 6 Power on Connect the power supply cable to the C6 P34 Box Fix...

Страница 40: ...rom the input connector Figure 37 Power on DC The system begins bootstrap Both the On Off Standby UPS LEDs located on the front and on the rear of the system DL2 will turn on The two LEDs light yellow...

Страница 41: ...es OFF OFF OFF The system is not powered Suspend to disk OFF ON It is safe to turn off power supply Operating system shutdown pro cedure is terminated Full on or suspend to RAM ON OFF System core is f...

Страница 42: ...because only a logon without password reaches immediate start of Control and HMI application after boot of the device which is generally the desired behavior for a machine control device Since in WES7...

Страница 43: ...divided into two volumes C and D of its half size each On C the Operating System and the runtimes Control HMI Connect are located D is reserved for future use The SSD is not divided in Win10 The appl...

Страница 44: ...ograms a rule in the firewall exists This is the recommended way to configure a firewall allow trusted programs to open any port instead of allow ports to be opened by any program However in case of a...

Страница 45: ...able to operate resistive touch displays The following table gives an overview Resistive Capacitive Single Touch eGalax driver eGalax driver Multi Touch Not possible Microsoft touch driver The approp...

Страница 46: ...ws updates for security reasons depends on an overall concept of security for the field of application and is the responsibility of the user of this device 4 3 EWF implementation in the Windows Embedd...

Страница 47: ...n another storage device a network share must be created that contains persistent data for the application This second volume will not be protected from power failures but will not contain infor matio...

Страница 48: ...nd the EWF configuration is stored in the regis try of the WES7 operating system which resides with the operating system on volume C This implies that changes to the EWF configuration are only possibl...

Страница 49: ...ctivate the EWF for volume C by clicking Yes The device will reboot immediately and the EWF is enabled for volume C If you click No the message box is closed but will be appear again after the next re...

Страница 50: ...e program s GUI appears with volume C provided that EWF for volume C has already been activated before Under the Volume you see the states of the selected volume as read only fields Overlay Type On KE...

Страница 51: ...a reboot NOTICE All changes on the volume since the last reboot become effec tive Do not execute this if you are not sure about the extent of the changes NOTICE The changes become effective immediatel...

Страница 52: ...an be initiated directly from the KEB_WF_Mgr to take effect for pending boot commands by using the particular buttons The program can also be left by the Exit button In this case the program checks fo...

Страница 53: ...e the same after each reboot and is therefore protected against damage that can be caused by a power failure 4 5 3 KEB UWF configuration and usage To protect the system on volume C including the regis...

Страница 54: ...our system Furthermore after activating the write filter the overflow info Overlay Info Current is displayed including type maximum size and current usage Depending on the current status of the UWF Ma...

Страница 55: ...e device 4 6 2 Service user accounts KEB Linux image has got a service account which can be used to change device set tings Account service Password service After login to the device with the service...

Страница 56: ...do this configure the Ethernet adapter of the development PC with another address 192 168 0 xxx and connect to the device with Putty as service user 4 6 3 Change password for service user To change th...

Страница 57: ...nfiguration The set e g the IP address 172 17 131 100 and the mask 255 255 255 0 must be en tered as followed 172 17 131 100 24 The value 24 for mask means 24 set bits in the mask beginning from left...

Страница 58: ...ore all variables and the consistency of the data set cannot be ensured The charging time of the micro UPS is about 15 s for C6 E22 P3x devices thus nor mally the micro UPS is always charged until the...

Страница 59: ...ple The other Internal I O Mapping variables 24 Vdc power input status and 24 Vdc power fail counter cannot be used in a sensible manner because the PLC is configuered to stop after a short voltage dr...

Страница 60: ...tting it is necessary to en ter the BIOS This is done by pressing the F2 key during start up You can change the settings by navigating to Advanced Super IO Configuration for C6 E22 or Advanced F81866...

Страница 61: ...ns 5 Mass storage and expansions 5 1 Mass storage CFast SATA III SSD mSATA III 5 1 1 CFast C6 P34 BOX can equipped with one SSD mSATA Figure 40 CFast detail 1 Slot for CFast Figure 41 CFast detail 1 1...

Страница 62: ...62 Mass storage and expansions 5 1 2 SSD mSATA C6 P34 BOX can optionally accommodate one SSD mSATA Figure 43 SSD detail 1 1 HDD SDD mSATA III Figure 44 SSD slot...

Страница 63: ...move the three screws On the back of the system remove the 3 fixing screws of the cover 1 1 1 Screws to be removed Figure 45 Removing the rear cover 6 2 Backup battery replacement Tool required Action...

Страница 64: ...illustrated in the pictures above Figure 47 Battery replacement 6 3 RAM installation removal 1 1 RAM position Figure 48 RAM installation removal Expel the module by slightly opening the side fastenin...

Страница 65: ...re 50 RAM installation removal 6 4 Fast installation removal The system can accommodate a CFast trough a push push connector Figure 51 CFast Slot detail 6 4 1 Installation Remove the cover as indicate...

Страница 66: ...dustrial application NOTICE Removing the system memory card while the project is running If you remove memory card while a project is running the project may stop NOTICE Potential data loss Do not rem...

Страница 67: ...ted power supply with MicroUPS and 256 kB MRAM 45 8 RAM memory 4 GB 1 module SODIMM DDR4 2133 3 9 Visualization COMBIVIS HMI Win32 64 Runtime optional Remote assistance COMBIVIS connect Win32 64 runti...

Страница 68: ...Memory Technology Memory quantity is automa tically selected by operating system System memory 4 GB 1 module SODIMM DDR4 2400 Mass storage 1 x onboard connector for direct insertion of mSATA SSD SATA...

Страница 69: ...r supply board is provided with a FAST FUSE 12A 125 A SMD The fuse can be replaced only in factory Power supply Type Isolated DC DC Isolation voltage 500 VAC Input voltage 18 32V DC Input protection R...

Страница 70: ...rated remo tation up to 100m of DVI I video signals and USB 2 0 without cables note 2 4 1 TPM TPM Trusted Platform Module 0 0 SSD mSATA note 3 SSD mSATA SATA 2 3Gb s Solid Sta te Disk MLC 2 0 SSD 2 5...

Страница 71: ...7 Battery CR2032 detail Model CR2032 MFR renata Chemical System Li MnO2 Nominal Voltage 3 V Rated Capacity 225 mAh Temperature Range 30 C 70 C Self Discharge at 23 C 1 year Table 11 Battery technical...

Страница 72: ...upport The staff who deal with this handle questions on the entire range of products skilfully quickly and efficiently You can phone our staff in the service department and they will give you complete...

Страница 73: ...nion Number EMC 2014 30 EU Text Directive on the approximation of the laws of the Member States relating to electromagnetic compatibility Number Hazardous Substances 2011 65 EEC incl 2015 863 EU Text...

Страница 74: ...A per phase EN 61000 3 3 Version 2013 Electromagnetic compatibility Part 3 3 Limits Limits of voltage changes voltage fluctuations and flicker in public low voltage systems for equipment with rated cu...

Страница 75: ...75 Certification 8 2 UL Marking...

Страница 76: ...76...

Страница 77: ...E Mail info keb it Internet www keb it Japan KEB Japan Ltd 15 16 2 Chome Takanawa Minato ku Tokyo 108 0074 Japan Tel 81 33 445 8515 Fax 81 33 445 8215 E Mail info keb jp Internet www keb jp P R China...

Страница 78: ......

Отзывы: