BOSS – Installation, Operation and Maintenance Manual
A l e n c o n S y s t e m s L L C - P a g e
|
23
Alencon Communication Environment (ACE) Setup
The ACE is a communication system containing hardware, and software elements provided by
Alencon to control power conversion equipment.
Hardware Element – PODD
Software Element – HUB
PODD Installation
Installation Options
Single PODD
A single PODD is installed at one end of a daisy chained RS-422 network. The total length
of the RS-422 network should not exceed 100 meters. An antenna will be included for each
PODD if wireless package is purchased.
Multi PODD
The centralized PODD will be stand-alone and installed in a central location. The PODD is
powered through the 120VAC to 24VDC power supply and POE injector included in the Wi-
Fi access point kit. Each distributed PODD will be installed at one end of a daisy chained
RS-422 network using an STP CAT5e cable. For a wired network, all distributed PODDs
will be daisy chained together, ending with the centralized PODD. If the wireless package is
purchased, an antenna will be provided for each distributed PODD and a Wi-Fi access
point will be used for the centralized PODD.
Installation Criteria
The following information should be considered when selecting the topology and the locations for
installation of PODDs:
Field Size
Application
Technical support will be provided when purchasing the ACE system to ensure the best PODD
configuration is selected for your application.
PODD Mounting
Each PODD will be shipped with the mounting bracket already installed.
PODD Mounting Location
The distributed PODDs will be mounted near the Alencon devices while the central PODD
will be mounted close to the inverter.
Mounting Parts
The PODD can be easily mounted using standard Unistrut© along with spring loaded
channel nuts. The attached hook shaped bracket allows for the PODD to be easily hung
on the unistrut and then fastened using a Hex head screw. More details on mounting the
PODD can be found in the PODD user manual.