Verify the BOSS DCDC’s communicate via the HUB
o
Check all 4 DCDC’s and their GUID’s show up
o
Clear any or all existing faults using the clear command
Figure 36: HUB display of the 4 DCDC's
Apply Input Voltage from the DC Source
o
Ensure input and output cables are connected to the terminal block
o
Hit Reset command – wait for BOSS to transition to standby
o
Establish Power Flow Direction i.e. BUS
BAT
o
Provide Current Set Point
Observe the current flowing at a specified set point.
Change the current set point and observe the actual current flowing at the
specified set point.
Change the direction of the current and give a new current set point. Observe
the actual amount of current and its direction.
o
Provide different current set points and observe the current flowing through the BOSS.
Ensure that the actual current follows the set point.
o
Once the test is complete, shutdown the BOSS using the shutdown command.
o
Turn off the DC Power Source.