www.alemitecarbonshield.com
16 | alemite Carbon Shield Service Sheet
Site Preparation
Install your Carbon Shield
™
cabinet in an area with
sufficient space (Fig. 22, 23) to accommodate:
• The opening of the cabinet door
• All system connections—electric, air, oil and
distribution piping
• A back-up console (recommended option)
with a changeover valve
• Suggested minimum floor space (allowing for the
equipment and maintenance access): 8 feet x
10 feet (or 2.4m x 3.0m, for console and backup
unit) 8 feet x 5 feet (2.4m x 1.5m, for console
unit alone)
Once the site is established, secure the console to
a level concrete surface. Use of a 4-to 6-inch (10cm
to 15cm) concrete riser pad between the floor and
the oil mist console is a common practice.
1. Prepare the surface with four anchor bolts (3/8”
or 10mm) at the required locations (eight bolts
if a backup unit is included) (Fig 24)
2. Lower the console over the bolts
a. Fasten the console securely to the anchors
with nuts and washers
installation
Fig. 24 Main unit with back-up unit
Fig. 25 Main unit
Fig. 26 Anchor bolts location for main and back up units
Содержание Carbon Shield
Страница 1: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL ...
Страница 2: ......
Страница 4: ...2 www alemitecarbonshield com Fig 01 ...
Страница 5: ...Alemite Carbon Shield Service Guide 3 www alemitecarbonshield com Fig 02 ...
Страница 39: ...Alemite Carbon Shield Service Guide 37 www alemitecarbonshield com ...
Страница 53: ...Alemite Carbon Shield Service Guide 51 www alemitecarbonshield com Wiring Diagrams Relay Wiring Fig 92 Fig 92 ...
Страница 57: ...References Installed Arrangement Fig 95 Fig 95 www alemitecarbonshield com ...