Before hanging indoor unit, decide the installation position and the pipe direction due to the piping
and the wiring in the ceiling.
Before hanging indoor unit, firstly prepare all the pipes(refrigerant pipe and drainage pipe) and the
wires(remote controller wire, connecting wire between indoor and outdoor), in order to connect with
the indoor at once after installation.
If the ceiling is existing, before hanging, place the refrigerant pipe, drainage pipe, indoor wires,
controller wires on the prepared position.
Confirm indoor dimension. For the unit with installation paper pattern, use the paper pattern to make
the dimension and the position of the unit and the ceiling ceiling opening identical when installation.
Hanging indoor unit
Adjust the screw cap (lower) position,
and keep the distance between
washer (lower) and the ceiling is Hmm,
as the table:
(5) Install the suspending pole
beam
To fix with built-in parts, foundation blots, etc.
135
150
150
H(mm)
A. According to indoor dimension, cut down and take away the ceiling base plate.
B. After making the proper installation hole, reinforce the cut surface of ceiling base plate, and modify
the ceiling edge to consolidate the base plate. To avoid ceiling vibration, it is important to consolidate
the base plate and keep the original level.
Fix the unit with M10 suspending pole (4 pieces,prepared on field) as the showed
dimension in the figure. Execute the proper installation due to the different room
structure and keep horizontal with th gradienter.
To bear the unit, in the place with existing ceiling, use the foundation bolt; while in
the place with new bulit ceiling,use the built-in bolt, embedded bolt or other parts
supplied on field.Before installation, adjust the distance to the ceiling.
Note:
Original concrete slab
Use hole-in hinge, hole-in plunger or hole-in bolt.
(pipe type suspension foundation pole)
(guiding type embedded part)
(knife type embedded part)
(4) The ceiling opening and reinforcement
New concrete slab
square wood
suspending
pole
reinforced
concrete
foundation bolt
Steel reinforcement structure
Use angle steel or new supporting angle steel directly.
suspending bolt
suspending pole
supporting angle steel
screw cap (upper)
washer (upper)
suspension bolt
suspending pole
washer (lower)
screw cap (lower)
ceiling
model
CBV009~ 16
CBV018~ 28
CBV030~ 48
47
Содержание YCV280
Страница 1: ...Design Installation and Maintenance instruction R410A Heat Pump 50 Hz FlowLogic II 2016...
Страница 5: ...2 External appearance YCV280 Outdoor YCV335 YCV400 YCV450 5...
Страница 13: ...This range it 13...
Страница 18: ...18...
Страница 34: ...4 Piping diagram liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 34...
Страница 61: ...40 100 270 12 5 J 130 940 220 Evaporators of 16 is 2 row type evaporator of 18 24 are 3 row type DAV016 24 61...
Страница 62: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 62...
Страница 83: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 83...
Страница 134: ...6 5 55 7 9 5 95 795 5 8 669 755 6 5 9 995 95 855 5 7 9 9 9 6 5 755 5 779 9 9 9 9 755 85 685 FAV038 48 134...
Страница 135: ...AQXQVO LQIOZIU fckoc jcj_ a m jcj_ FFV cfn_l cfn_l h ch iil b_ n _r b ha_l 135...
Страница 170: ...C 938 1046 186 5 234 2 6 5 2 9 9 A B MODEL 3 Dimensions HAV007 16 HAV018 24 170...
Страница 171: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 171...
Страница 178: ...Installation 8 178...
Страница 179: ...179...
Страница 180: ...HAV018 24 HAV007 16 180...
Страница 181: ...181...
Страница 185: ...9QTMUZQVUZ 86 97 6 96 8 786 8MU MY VN OYI Q 185...
Страница 186: ...0 CQWQUO LQIOYITZ hemqe lela c o lela GGX behpan behpan b j ej kkn da p at_d jcan 186...
Страница 200: ...N PR 6 MkjZeeh Sd_ji 62A B yt F vwv 200...
Страница 206: ...206...
Страница 208: ...208...
Страница 209: ...209...
Страница 210: ...210...
Страница 211: ...211...
Страница 212: ...212...
Страница 249: ...E Capacity compensation value at different piping length and drop 255...
Страница 260: ...outdoor1 outdoor2 outdoor3 outdoor1 outdoor2 outdoor3 Installation at high difference outdoor1 outdoor2 outdoor3 266...
Страница 280: ...286...
Страница 298: ...RWV02 FlowLogic 304...
Страница 309: ...Installation and connections Dimensions Connecting board 315...
Страница 315: ...Ports Each port have serial number like 1 2 3 8 System Brief 321...
Страница 322: ...Next Next Next 328...
Страница 324: ...Select mysql then click ok Then click close ODBC setting Open ODBC database in the route control panel manage tool 330...
Страница 325: ...Select system DNS Click and add 331...
Страница 326: ...Select mysql then click finish Input according to the below information in the page Password is 1 Click OK 332...
Страница 327: ...3 Software installation Next 333...
Страница 331: ...337...