2.4 Field refrigerant piping
Treatment for pipes to prevent compressor being blocked
Compressor failure includes being blocked and motor burnt. It manybe because of damaged parts, but mainly it is
relative to the installation and the pipe specification.
Measures to prevent piping failure
A. Charge nitrogen fluently
1)Non-flow nitrogen will produce the film (CU
2
O). The oxide film will cause the serious failure.
2)The exterior substance will cause the capillary or the expansion valve blocked, abnormal discharging temperature,
not cooling or heating, compressor locked, etc.
B. Do not let water into the pipe.
1)Do not install the pipe when raining.
2)Hang and fix the outdoor pipe to prevent water into it. The water in pipe will cause the following effect: the capillary
or the expansion valve blocked, refrigerant hydrolized into acid substance, cause abnormal crystal by refrigerant oil
reaction.
C. Do not let dust or other matter such as the concrete fragment, sand, or the clinker etc into the pipe. Please deal
with them carefully.
D. Adopt the specified copper pipe.
too thick or
too long
abnormal discharging
oil return difficult
compressor
locked
E. Fix the refrigerant pipe
1)In operation, the pipe will vibrate and expand or shrink. If not being fixed, the refrigerant will focus on one part to
cause the broken pipe.
2)To prevent the central stress, fix the pipe for every 2-3m.
Heat insulation (Gas pipe, liquid pipe and oil equalization pipe must be treated with the heat
insulation material against heat release and condensate)
A. The heat insulation material can prevent the condensate caused on gas pipe, which will result in leakage; and
the material can prevent someone being scalded for the high temperature on the gas pipe.
B. Wrap the indoor connection pipe with the heat insulation material.
1)Gas pipe and liquid pipe should be heat insulated separately.
2)The material for gas pipe should endure the high temperature over 120 C.
3)The material thickness should be over 10mm, when ambient temp. is 30 C, and the relative humidity is over 80%,
the material thickness should be over 15mm.
C. The material should cling the pipe closely without gap, then be wrapped with adhesive tape. The connection wire
can not be put together with the heat insulation material and should be far at least 20cm.
271
Содержание YCV280
Страница 1: ...Design Installation and Maintenance instruction R410A Heat Pump 50 Hz FlowLogic II 2016...
Страница 5: ...2 External appearance YCV280 Outdoor YCV335 YCV400 YCV450 5...
Страница 13: ...This range it 13...
Страница 18: ...18...
Страница 34: ...4 Piping diagram liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 34...
Страница 61: ...40 100 270 12 5 J 130 940 220 Evaporators of 16 is 2 row type evaporator of 18 24 are 3 row type DAV016 24 61...
Страница 62: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 62...
Страница 83: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 83...
Страница 134: ...6 5 55 7 9 5 95 795 5 8 669 755 6 5 9 995 95 855 5 7 9 9 9 6 5 755 5 779 9 9 9 9 755 85 685 FAV038 48 134...
Страница 135: ...AQXQVO LQIOZIU fckoc jcj_ a m jcj_ FFV cfn_l cfn_l h ch iil b_ n _r b ha_l 135...
Страница 170: ...C 938 1046 186 5 234 2 6 5 2 9 9 A B MODEL 3 Dimensions HAV007 16 HAV018 24 170...
Страница 171: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 171...
Страница 178: ...Installation 8 178...
Страница 179: ...179...
Страница 180: ...HAV018 24 HAV007 16 180...
Страница 181: ...181...
Страница 185: ...9QTMUZQVUZ 86 97 6 96 8 786 8MU MY VN OYI Q 185...
Страница 186: ...0 CQWQUO LQIOYITZ hemqe lela c o lela GGX behpan behpan b j ej kkn da p at_d jcan 186...
Страница 200: ...N PR 6 MkjZeeh Sd_ji 62A B yt F vwv 200...
Страница 206: ...206...
Страница 208: ...208...
Страница 209: ...209...
Страница 210: ...210...
Страница 211: ...211...
Страница 212: ...212...
Страница 249: ...E Capacity compensation value at different piping length and drop 255...
Страница 260: ...outdoor1 outdoor2 outdoor3 outdoor1 outdoor2 outdoor3 Installation at high difference outdoor1 outdoor2 outdoor3 266...
Страница 280: ...286...
Страница 298: ...RWV02 FlowLogic 304...
Страница 309: ...Installation and connections Dimensions Connecting board 315...
Страница 315: ...Ports Each port have serial number like 1 2 3 8 System Brief 321...
Страница 322: ...Next Next Next 328...
Страница 324: ...Select mysql then click ok Then click close ODBC setting Open ODBC database in the route control panel manage tool 330...
Страница 325: ...Select system DNS Click and add 331...
Страница 326: ...Select mysql then click finish Input according to the below information in the page Password is 1 Click OK 332...
Страница 327: ...3 Software installation Next 333...
Страница 331: ...337...