COOL , HEAT and DRY Operation
1. Unit start
Press ON/OFF button,unit starts.
Previous operation status appears on LCD (except for TIMER, SLEEP and
SWING setting)
2.Select operation mode
Press MODE button. At each press, operation mode changes as follows:
follows:
In HEAT mode,warm air will blow out after a short period of time
due to anti-cold function.
3.Temperature setting
Press TEMP button.
4.Adjust FAN button
Press FAN button. At each press, fan speed changes as follows:
Air conditioner will run at the selected fan speed.
COOL operation starts
when room temp.is
higher than temp.setting.
Every time the button is pressed, temp. setting increases 1degree. If button is kept depressed, temp.
setting will increase quickly.
Every time the button is pressed, temp. setting decreases 1degree. If button is kept depressed, temp.
setting will decrease quickly.
Set proper temperature
A
U
T
O
LOW
MID
HIGH
AUTO
FRESH
HIGH/SO
TIMER
SET
FILTER
B
HEALTH
RESET
LOCK
SLEEP
FAN
TEMP
ON
OFF
SWING
MODE
CLOCK
CODE
LIGHT
A
U
T
O
1
5
4
COOL
DRY
HEAT
Then select operation or select operation or select operation
COOL
DRY
HEAT
5. Unit stop
Press ON/OFF button, unit stops
Ultra-low air flow
On reaching temp. setting
+2 C, unit will run in mild
DRY mode.
Temp. s2 C
HEAT
366
Содержание YCV280
Страница 1: ...Design Installation and Maintenance instruction R410A Heat Pump 50 Hz FlowLogic II 2016...
Страница 5: ...2 External appearance YCV280 Outdoor YCV335 YCV400 YCV450 5...
Страница 13: ...This range it 13...
Страница 18: ...18...
Страница 34: ...4 Piping diagram liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 34...
Страница 61: ...40 100 270 12 5 J 130 940 220 Evaporators of 16 is 2 row type evaporator of 18 24 are 3 row type DAV016 24 61...
Страница 62: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 62...
Страница 83: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 83...
Страница 134: ...6 5 55 7 9 5 95 795 5 8 669 755 6 5 9 995 95 855 5 7 9 9 9 6 5 755 5 779 9 9 9 9 755 85 685 FAV038 48 134...
Страница 135: ...AQXQVO LQIOZIU fckoc jcj_ a m jcj_ FFV cfn_l cfn_l h ch iil b_ n _r b ha_l 135...
Страница 170: ...C 938 1046 186 5 234 2 6 5 2 9 9 A B MODEL 3 Dimensions HAV007 16 HAV018 24 170...
Страница 171: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 171...
Страница 178: ...Installation 8 178...
Страница 179: ...179...
Страница 180: ...HAV018 24 HAV007 16 180...
Страница 181: ...181...
Страница 185: ...9QTMUZQVUZ 86 97 6 96 8 786 8MU MY VN OYI Q 185...
Страница 186: ...0 CQWQUO LQIOYITZ hemqe lela c o lela GGX behpan behpan b j ej kkn da p at_d jcan 186...
Страница 200: ...N PR 6 MkjZeeh Sd_ji 62A B yt F vwv 200...
Страница 206: ...206...
Страница 208: ...208...
Страница 209: ...209...
Страница 210: ...210...
Страница 211: ...211...
Страница 212: ...212...
Страница 249: ...E Capacity compensation value at different piping length and drop 255...
Страница 260: ...outdoor1 outdoor2 outdoor3 outdoor1 outdoor2 outdoor3 Installation at high difference outdoor1 outdoor2 outdoor3 266...
Страница 280: ...286...
Страница 298: ...RWV02 FlowLogic 304...
Страница 309: ...Installation and connections Dimensions Connecting board 315...
Страница 315: ...Ports Each port have serial number like 1 2 3 8 System Brief 321...
Страница 322: ...Next Next Next 328...
Страница 324: ...Select mysql then click ok Then click close ODBC setting Open ODBC database in the route control panel manage tool 330...
Страница 325: ...Select system DNS Click and add 331...
Страница 326: ...Select mysql then click finish Input according to the below information in the page Password is 1 Click OK 332...
Страница 327: ...3 Software installation Next 333...
Страница 331: ...337...