Model:
Model:
680 840
950
890
A
B
C
D
model
890mm(ceiling opening)
790mm(between suspending bolts)
View A
890mm(ceiling opening)
690mm(between suspending bolts)
60mm
25mm
150mm
ceiling
950
mm ornament panel
890
mm ceiling opening
840
mm indoor unit
780
mm
Distance
between suspending bolts
pipe joint
suspending
bolt
Cmm
Dmm
Bmm
Note:
The dimension marked with can be up to 910mm, but
the overlap distance should be over 20mm.
(3) Position among ceiling opening, unit and suspending bolt
320mm
150mm
60mm
Overlap between ceiling and
ornament panel shall be 25mm
Suspending bolts
Ceiling Ornament panel
Distance between suspending
bolts 535mm
ceiling opening
650mm
Ornament panel
700mm
Indoor unit 570mm
Indoor unit 570mm
Ceiling opening 650mm
Ornament panel 700mm
Model:
View A
320mm
over 20mm
Ceiling
suspending
bolt
View A
(Distance between suspending bolts)
A
(Ornament panel)
(Ceiling opening)
(Indoor unit)
950mm
CBV009~ 16
CBV018~ 28
CBV030~ 48
CBV018~ 28
46
Содержание YCV280
Страница 1: ...Design Installation and Maintenance instruction R410A Heat Pump 50 Hz FlowLogic II 2016...
Страница 5: ...2 External appearance YCV280 Outdoor YCV335 YCV400 YCV450 5...
Страница 13: ...This range it 13...
Страница 18: ...18...
Страница 34: ...4 Piping diagram liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 34...
Страница 61: ...40 100 270 12 5 J 130 940 220 Evaporators of 16 is 2 row type evaporator of 18 24 are 3 row type DAV016 24 61...
Страница 62: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 62...
Страница 83: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 83...
Страница 134: ...6 5 55 7 9 5 95 795 5 8 669 755 6 5 9 995 95 855 5 7 9 9 9 6 5 755 5 779 9 9 9 9 755 85 685 FAV038 48 134...
Страница 135: ...AQXQVO LQIOZIU fckoc jcj_ a m jcj_ FFV cfn_l cfn_l h ch iil b_ n _r b ha_l 135...
Страница 170: ...C 938 1046 186 5 234 2 6 5 2 9 9 A B MODEL 3 Dimensions HAV007 16 HAV018 24 170...
Страница 171: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 171...
Страница 178: ...Installation 8 178...
Страница 179: ...179...
Страница 180: ...HAV018 24 HAV007 16 180...
Страница 181: ...181...
Страница 185: ...9QTMUZQVUZ 86 97 6 96 8 786 8MU MY VN OYI Q 185...
Страница 186: ...0 CQWQUO LQIOYITZ hemqe lela c o lela GGX behpan behpan b j ej kkn da p at_d jcan 186...
Страница 200: ...N PR 6 MkjZeeh Sd_ji 62A B yt F vwv 200...
Страница 206: ...206...
Страница 208: ...208...
Страница 209: ...209...
Страница 210: ...210...
Страница 211: ...211...
Страница 212: ...212...
Страница 249: ...E Capacity compensation value at different piping length and drop 255...
Страница 260: ...outdoor1 outdoor2 outdoor3 outdoor1 outdoor2 outdoor3 Installation at high difference outdoor1 outdoor2 outdoor3 266...
Страница 280: ...286...
Страница 298: ...RWV02 FlowLogic 304...
Страница 309: ...Installation and connections Dimensions Connecting board 315...
Страница 315: ...Ports Each port have serial number like 1 2 3 8 System Brief 321...
Страница 322: ...Next Next Next 328...
Страница 324: ...Select mysql then click ok Then click close ODBC setting Open ODBC database in the route control panel manage tool 330...
Страница 325: ...Select system DNS Click and add 331...
Страница 326: ...Select mysql then click finish Input according to the below information in the page Password is 1 Click OK 332...
Страница 327: ...3 Software installation Next 333...
Страница 331: ...337...