4. State setting of trial operation
4.1 Confirm being electrified
Indoor and outdoor are electrified respectively and then check as the following table:
No.
inspection items
results
1
If outdoor connecting board is electrified; if digital tube is working well
(when moving the dip switch, check if digital tube data changes.
2
3
If indicator LED2 and LED5 of communication between master unit and
connecting board flash.
4
If the outdoor quantity that master unit searched is correct. If there is one
slave unit, LED on master unit will display 0000, 1111 repeatedly; if there
are two slave units, LED on master unit will display 0000, 1111, 2222
repeatedly... and so on.
5
6
7
If indoor/outdoor communication indicator LED4 and LED7 flash.
Check if the outdoor data is correct by the dip switch on outdoor connecting
board or the testing device and the software. Check the data such as
outdoor sensor, EEV open angle, etc.
Check if the oil temp. sensor at compressor bottom is over 35 degree, if
less than 35degree, please electrify the outdoor for 12 hours; if more than
35 degree, please make compulsory operation. Otherwise the unit will not
start up, even in compulsory operation.
Check if the indoor data is correct by the dip switch on indoor connecting
board or the testing device and the software. Check the data such as
indoor sensor, EEV open angle, etc.
295
Содержание YCV280
Страница 1: ...Design Installation and Maintenance instruction R410A Heat Pump 50 Hz FlowLogic II 2016...
Страница 5: ...2 External appearance YCV280 Outdoor YCV335 YCV400 YCV450 5...
Страница 13: ...This range it 13...
Страница 18: ...18...
Страница 34: ...4 Piping diagram liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 34...
Страница 61: ...40 100 270 12 5 J 130 940 220 Evaporators of 16 is 2 row type evaporator of 18 24 are 3 row type DAV016 24 61...
Страница 62: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 62...
Страница 83: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 83...
Страница 134: ...6 5 55 7 9 5 95 795 5 8 669 755 6 5 9 995 95 855 5 7 9 9 9 6 5 755 5 779 9 9 9 9 755 85 685 FAV038 48 134...
Страница 135: ...AQXQVO LQIOZIU fckoc jcj_ a m jcj_ FFV cfn_l cfn_l h ch iil b_ n _r b ha_l 135...
Страница 170: ...C 938 1046 186 5 234 2 6 5 2 9 9 A B MODEL 3 Dimensions HAV007 16 HAV018 24 170...
Страница 171: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 171...
Страница 178: ...Installation 8 178...
Страница 179: ...179...
Страница 180: ...HAV018 24 HAV007 16 180...
Страница 181: ...181...
Страница 185: ...9QTMUZQVUZ 86 97 6 96 8 786 8MU MY VN OYI Q 185...
Страница 186: ...0 CQWQUO LQIOYITZ hemqe lela c o lela GGX behpan behpan b j ej kkn da p at_d jcan 186...
Страница 200: ...N PR 6 MkjZeeh Sd_ji 62A B yt F vwv 200...
Страница 206: ...206...
Страница 208: ...208...
Страница 209: ...209...
Страница 210: ...210...
Страница 211: ...211...
Страница 212: ...212...
Страница 249: ...E Capacity compensation value at different piping length and drop 255...
Страница 260: ...outdoor1 outdoor2 outdoor3 outdoor1 outdoor2 outdoor3 Installation at high difference outdoor1 outdoor2 outdoor3 266...
Страница 280: ...286...
Страница 298: ...RWV02 FlowLogic 304...
Страница 309: ...Installation and connections Dimensions Connecting board 315...
Страница 315: ...Ports Each port have serial number like 1 2 3 8 System Brief 321...
Страница 322: ...Next Next Next 328...
Страница 324: ...Select mysql then click ok Then click close ODBC setting Open ODBC database in the route control panel manage tool 330...
Страница 325: ...Select system DNS Click and add 331...
Страница 326: ...Select mysql then click finish Input according to the below information in the page Password is 1 Click OK 332...
Страница 327: ...3 Software installation Next 333...
Страница 331: ...337...