9.4 Unit transport and installation
Attention
When ropes are used for transporting unit, it is necessary to consider shift of gravity center of the unit. The unit
may fall due to loss of stability.
1. Transport
2. Attentions during installation
• Please determine handling route and handle the unit with package to the
installation location.
• To avoid damaging the unit during hoisting, protect the unit with cloth liner and lift it
with two pieces of cloth ropes.
Warning:
(A) The ropes must pass through the corner hole of fixing foot of the unit.
(B) To avoid damaging the unit, make the ropes touch the unit along bottom plate and cloth
liner.
(1) Position of fixing bolt
• Please use 4 fixing bolts (M10) to fasten fixing feet of outdoor unit. The bolts with specification of 20mm are
preferable.
(2) Base
• During setting, confirm base strength and levelness and whether vibration and noise are produced.
• As to base size, set it as the scope above oblique lined area (above the front of fixing foot of outdoor unit) in the
figure above.
• Set the base in side direction of outdoor (in the direction with width of 1,350 mm) as per the figure above.
Unit body
Position of fixing bolt (●mark)
Size of fixing bolt
(Body size)
(Size of fixing bolt)
(Body size)
Base
Generally set the base
according to the figure above
Do not refer to the previous
unit type for base direction
unit: mm
Above 100 mm
Use it when conducting
updating (adding base in the
middle) to prevent bending.
Содержание AWAU-YDV1010-H13
Страница 1: ...SYJS 03 2017 REV A Edition 2017 03 Service Manual Flow Logic III...
Страница 56: ...54 7 Operation range...
Страница 102: ...100 Power module driver board 0151800090B and 0151800090...
Страница 103: ...101 Filter board MHW505A012...
Страница 187: ...Airwell reserves the right to make change without any notice...