![Air Monitor MASS-tron II/CEM Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/air-monitor/mass-tron-ii-cem/mass-tron-ii-cem_installation-operation-and-maintenance-manual_2875334011.webp)
MASS-tron II/CEM
Air Monitor Corporation
116-004-94.P65 (8-31-10)
MASS-tron II/CEM
- IO&M Manual
6
4.4 – PROCESS CONNECTIONS
The MASS-tron II/CEM comes standard with brass 1/8" FPT connections (or special fittings if ordered). To these
connections the customer can install fittings required for the type of tube/pipe used to connect to process sensor (i.e.
flow station, flow probe, static pressure sensors).
When connecting the MASS-tron II/CEM to an airflow measuring device, connections must be completed as follows:
– High Port on MASS-tron II/CEM connects to Total Pressure from airflow measuring device.
– Low Port on MASS-tron II/CEM connects to Static Pressure from airflow measuring devices.
Although any size of tube/pipe can be used, the response time of the MASS-tron II/CEM to process change may
increase if there is a increase in tube/pipe size or an increase in tube/pipe length.
CAUTION
– Selected fittings should be compatible with the brass 1/8" FPT bulkhead connection, and installed using an
appropriate thread lubricant/sealant.
– When signal fittings are added or removed, use a 9/16 wrench to prevent the 1/8" FPT bulkhead fitting from
turning.
– It is extremely important that no pressure be present in signal tubing at the time of installation, and the
orientation of high and low pressure signal lines is maintained between the source and the MASS-tron II/CEM.
Figure 4.1
SECTION 4 – INSTALLATION
Mass Flow Transmitter
M
C
A
IR ONITOR ORPORATION
Содержание MASS-tron II/CEM
Страница 2: ......