![AIC COILMASTER 100 Скачать руководство пользователя страница 62](http://html1.mh-extra.com/html/aic/coilmaster-100/coilmaster-100_installation-and-maintenance-manual-for-the-installer-and-the-user_2870753062.webp)
Fig. 18. Testing the Flue Pressure Switch
1
2
3
I-62
G-084383_EN • 03
M
aintenance
Checking the Flue Pressure Switch oper-
ation
Conditions:
Tools and material:
î
Manometer (measuring range up to min 500 Pa)
Check Procedure:
This procedure needs to be per-
formed with boiler (and controller)
running, and the front panel open.
When performing the following
procedure, do not touch the high
voltage connections and do no
touch any inner component of the
boiler with any wet body part.
1.
At the condens dish (
3
), disconnect the hose
(
2
) running from the condens dish to the flue
pressure switch (
1
).
2.
Connect a T-piece to the hose.
3.
Connect pressure meter to one of the T-piece
connections.
ON
4.
Blow air in the hose while it is connected to
the flue pressure switch and to the measur-
ing device
5.
Verify that the pressure switch switches at
the set pressure (500 Pa) and that the con-
troller displays error 193.
6.
In case of malfunction, replace the flue pres-
sure switch.
Follow-on tasks:
1.
Reconnect the hose (
2
) to the condens dish (
3
).
2.
Check that the connection is not leaking.
Содержание COILMASTER 100
Страница 67: ...X3 3 4 5 2 Fig 21 CM 60 70 80 Removing and Installing the Burner 1 6 I 67 G 084383_EN 03 Maintenance...
Страница 69: ...3 5 2 1 Fig 22 CM 100 120 Removing and Installing the Burner I 69 G 084383_EN 03 Maintenance...
Страница 92: ...I 92 G 084383_EN 03 Declaration of Conformity...
Страница 93: ...I 93 G 084383_EN 03 NOTES...
Страница 94: ...www myaic eu AIC Europe B V Graafschap Hornelaan 163A NL 6001 AC Weert The Netherlands...