![AIC COILMASTER 100 Скачать руководство пользователя страница 49](http://html1.mh-extra.com/html/aic/coilmaster-100/coilmaster-100_installation-and-maintenance-manual-for-the-installer-and-the-user_2870753049.webp)
X4
Fig. 13. Accessing the High and Low Voltage Terminal Strips and Electronic Board
1
2
I-49
G-084383_EN • 03
P
roduct
I
nstallatIon
Conditions:
Tools and material:
î
Wrench, hex head,
size 3
Procedure:
1.
Remove boiler front panel, see
“Removing and
Installing the Access Panels” on page
I-31.
OFF
Accessing the High and Low Voltage Ter-
minal Strips and Electronic Board
Make sure that the power supply to
the appliance is deactivated (pow-
er supply cable disconnected from
the boiler) before accessing the high
voltage terminal strip.
Also see
“Optional Modules” on page
I-72
for more information on available optional
electronic components.
i
The electronic bay cover panel is
only secured to the boiler frame
by four screws. Make sure to sup-
port the cover panel at removal, as
the controller cable needs to be
disconnected from the electronic
board.
2.
Holding the electronic bay cover panel, re-
move four screws (
1
). Retain for installation.
3.
Carefully remove the electronic bay cover
panel (
2
) and disconnect the cable from the
back of the control panel.
4.
Proceed in the reverse order to reinstall the
electronic bay cover panel back in position.
Follow-on tasks:
None
Содержание COILMASTER 100
Страница 67: ...X3 3 4 5 2 Fig 21 CM 60 70 80 Removing and Installing the Burner 1 6 I 67 G 084383_EN 03 Maintenance...
Страница 69: ...3 5 2 1 Fig 22 CM 100 120 Removing and Installing the Burner I 69 G 084383_EN 03 Maintenance...
Страница 92: ...I 92 G 084383_EN 03 Declaration of Conformity...
Страница 93: ...I 93 G 084383_EN 03 NOTES...
Страница 94: ...www myaic eu AIC Europe B V Graafschap Hornelaan 163A NL 6001 AC Weert The Netherlands...