![AIC COILMASTER 100 Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/aic/coilmaster-100/coilmaster-100_installation-and-maintenance-manual-for-the-installer-and-the-user_2870753030.webp)
I-30
G-084383_EN • 03
P
roduct
I
nstallatIon
Handling the Product
î
This appliance is heavy and re-
quires sufficient workforce to
move and handle it, as well as
an appropriate means of trans-
port. Make sure to comply
with applicable local stand-
ards and regulations on prod-
uct handling.
î
It is prohibited to handle the boiler using
protruding components or rest the boiler
on protruding components.
î
Failure to comply with these recom-
mendations can result in damage to
the boiler or injuries to the personnel
Using a hand truck or another appropriate means,
move the appliance in its packaging close to the instal-
lation location.
Unpacking the Product
The boiler is delivered on a wooden pallet and is se-
cured to the pallet with four screws. The boiler is pro-
tected by a foam protection and plastic wrapping.
Once the appliance is in the boiler room or close to
the installation location:
1.
Carefully remove the plastic packaging and
foam protections.
2.
Discard packaging according to applicable
local regulations.
Installing and Preparing the Boiler
1.
Slide the arms of the fork lift underneath the
boiler, from the front of the appliance (See
Fig. 8)
.
î
Make sure that the front bottom
panel is removed for transport
.
î
Make sure to insert the fork lift arms
from the front of the boiler.
î
Do not insert the fork lift arms from the back,
as it may damage the connections.
2.
Move the appliance carefully to its final po-
sition. Make sure to comply with the recom-
mended clearances (See
“Dimensions” on
page G-13.
3.
If some height is required for condensate flow
to the sewer system or if a condensate neu-
tralisation system needs to be installed, place
the appliance on a base with sufficient height
(recommended slope to the drain: 3%).
Follow-on task(s):
None
Fig. 8. Boiler transport and Installation
4 screws to be re-
moved from the
bottom of the boiler
(left and right side)
to remove the boiler
from the pallet.
X4
i
Содержание COILMASTER 100
Страница 67: ...X3 3 4 5 2 Fig 21 CM 60 70 80 Removing and Installing the Burner 1 6 I 67 G 084383_EN 03 Maintenance...
Страница 69: ...3 5 2 1 Fig 22 CM 100 120 Removing and Installing the Burner I 69 G 084383_EN 03 Maintenance...
Страница 92: ...I 92 G 084383_EN 03 Declaration of Conformity...
Страница 93: ...I 93 G 084383_EN 03 NOTES...
Страница 94: ...www myaic eu AIC Europe B V Graafschap Hornelaan 163A NL 6001 AC Weert The Netherlands...