
25
877.218.1981
Revised09.2018R1
TYPICAL PLUMBING SETUP
(Read Instructions Completely before Beginning Installation)
1
3
5
4
NOTE: For 32 oz/ac rate and
speeds 7 mph or less, the
green ball will work best.
Higher speeds may work
better with the red ball
6
2
1/3# IN LINE CHECK VALVE
PN# 55212
Your shanks and plumbing setup may vary from those shown here.
The 4’ green tube delivers the product to the shank.
1. Slide a 2’ piece of 3/8” hose over the green tube along with 2 clamps.
2. Slide the green hose in the tube on the shank as far as it will go.
3. Slide the 3/8” hose down over the tube. Clamp 3/8” hose at the top and at the bottom.
4. Connect Gray tube 1/4” QC x 1/4” QC. *Navy Blue tube will be used when cold weather and/or high
speeds create too high pressure in the Gray tube.
5. Connect Navy blue tube to outlet side check valve provided.
6. Connect the black 1/4” tubing from top of flow indicator to inlet of check valve.
Содержание Synergist GX40 System
Страница 36: ......