Version May 2021
30
EN
agru SP 63 mobile
V 3
User’s Manual
agru Kunststofftechnik GmbH
Ing.-Pesendorfer-Str. 31
4540 Bad Hall, Austria
This feature allows programming a date and
time-of-day when the heating element must start
heating up. This gives you the possibility, e.g., to
enter this evening a time for the following morn-
ing and, then, to start welding right after arriving
at the worksite instead of waiting for the heating
element to reach the appropriate temperature.
For the automatic heating feature to work,
the welding machine has to be connected to
the power supply and be switched on all the
time from preprogramming a time-of-day to
the start of heating. Both power supply fail-
ure and switching the machine off result in loss of the preset time.
Enter the desired date and time-of-day on the keypad (after
each input, the machine moves on to the next field automati-
cally), then touch the
button. This button shows the current
status of the automatic heating: gray = disabled, green = enabled.
Important
Enabling the automatic heating feature should be the last action
before you leave the worksite. For it causes the power supply
to the heating element to be stopped and it cools down. Whilst
it is possible to quit the automatic heating setting screen by
touching the
button and do other jobs at the machine,
when the status button is set to
(on), no more welding
operations are possible.
If automatic heating is neither canceled nor disabled, it makes sure that
the heating element starts heating at the preset time-of-day and switches
itself off after doing so.
Info
If a welding operation with a longer duration is the last one before
the end of the workday, power supply to the heating element
can be kept alive until that welding is finished. This requires
programming the desired automatic date and time for heating,
but then touching rather than the
button, the
button
to enable it (both buttons will then turn green). If the automatic
heating feature is enabled in this manner, the machine allows
for another welding operation, to be started immediately after
this, and cuts power to the heating element only at the end of
its heating stage.
It is thus possible in case of a relatively long jointing opera-
tion as the last one of the workday, to leave the worksite early,
provided no other work instructions or occupational safety
rules prohibit this
.
6.3 Service and Repair
As the machine is used in applications that are sensitive to safety con-
siderations, it may be serviced and repaired only on our premises or by
partners who were specifically trained and authorized. Thus, constantly
high standards of operation quality and safety are maintained.
Important
Non-compliance with this provision will dispense the manufac-
turer from any warranty and liability claims for the product and
any consequential damage.
All machines that are new or newly programmed during maintenance or
upon request are shipped with the most recent software version.
Display 24