Appendix B - 64
Load (Internal)
•
Accept PCBA forward into Main Loader
—
Move PCBA from the
Left Loader forward onto the Main Loader.
•
Accept PCBA reverse into Main Loader
—
Move PCBA from the
Right Loader reverse onto the Main Loader.
Unload (Internal)
•
Eject PCBA forward from Main Loader
—
Move PCBA from the
Main Loader onto the Right Loader.
•
Eject PCBA reverse from Main Loader
—
Move PCBA from the
Main Loader onto the Left Loader.
Unload (External)
•
Eject PCBA forward from Main Loader
—
Move PCBA from the
Right Loader onto the output conveyor.
•
Eject PCBA reverse from Main Loader
—
Move PCBA from the
Left Loader onto the output conveyor.
Содержание 5DX II Series
Страница 4: ... iv ...
Страница 14: ......
Страница 57: ...Installation 43 Installation INSTALLATION NOTES ...
Страница 58: ...Installation 44 ...
Страница 74: ...Appendix A 60 ...
Страница 80: ...Appendix B 66 ...