Installation - 36
k.
Type
ma
and press
Enter
to return to the master
directory.
6.
5DX Main Cabinet Radiation Integrity Check
—
To verify the 5DX Cabinet Integrity and
containment of X-Ray emissions, perform the
following steps:
CAUTION
If any of the readings in the following tests exceed 0.15
mRems/hour, shut off the X-ray system and contact SPT
second level support immediately.
a.
Turn
ON
the GM Radiation Meter (Victoreen™
Model 290 or equivalent). Allow a warm up period
of 2 minutes.
b.
From the DOS prompt type
hvxray
-s
and press
Enter
.
c.
At the hvxray menu use the arrow keys to select
“Cathode µA”
and press
Enter
, then type
10
and
press
Enter.
This will bring current to 10
microamps so X-rays are on slightly.
d.
Use the GM Meter and perform a quick survey of
the 5DX Main Cabinet. Focus on areas where
radiation leaks are suspect such as doors, access
panels, etc.
Leakage must be less than 0.15
mRems/hr.
e.
Increase the
Cathode µA
and to
40
(using the same
process as in
b
and
c
above) and press
Enter.
f.
Use the GM Meter and perform another quick
survey of the 5DX Main Cabinet.
Leakage must be
less than 0.15 mRems/hr.
g.
Increase the
Cathode µA
and to
100
and press
Enter.
!
Содержание 5DX II Series
Страница 4: ... iv ...
Страница 14: ......
Страница 57: ...Installation 43 Installation INSTALLATION NOTES ...
Страница 58: ...Installation 44 ...
Страница 74: ...Appendix A 60 ...
Страница 80: ...Appendix B 66 ...