Installation - 35
Ins
ta
lla
ti
o
n
f.
From the Operator Control Panel (
) turn the
X-Ray Enable Key to
Enable
, then push the
X-Ray
On Button
.
Figure 17
Operator Control Panel
g.
From the DOS prompt type
ma
and press
Enter
to
enter the
Master
directory. From the DOS prompt
type:
xrayon
-zero
and press
Enter
.
NOTE
The
-
key is the dash, or “minus” sign:
-
NOTE
A warning will display. Press
~
to continue. The
time remaining should indicate 60 minutes.
h.
Assuming the High Voltage has successfully ramped
up (after 60 minutes) and remained on, from the DOS
prompt, type
ca
and press
Enter.
IMPORTANT
If the Kilovolts reading in the X-ray control window did not
reach 160, or the X-ray system shut itself off, contact SPT
second level support as soon as possible.
i.
Type
vs xray.cfg
, edit the line labeled
Cold
Start Rampup
to have a value of
15
(the original
value).
j.
After editing press
ALT
+
w
to
save
the file and press
ALT
+
x
to
exit
the editor.
DANGER
Off
CAUTION
X-RAYS
THIS EQUIPMENT PRODUCES
X-RAYS WHEN ENERGIZED
INVISIBLE LASER RADIATION
CONTAINED WHEN ENERGIZED.
DO NOT ATTEMPT TO DEFEAT
SAFETY INTERLOCKS.
5mW CONTINUOUS
AT 780 NANOMETERS
CLASS IIIB LASER SUB-SYSTEM
CLASS 1 LASER PRODUCT
Enable
X-ray Control
Off
On
Safety
Interlocks Closed
Laser On
X-ray On
Enable key
X-Ray ON button
Содержание 5DX II Series
Страница 4: ... iv ...
Страница 14: ......
Страница 57: ...Installation 43 Installation INSTALLATION NOTES ...
Страница 58: ...Installation 44 ...
Страница 74: ...Appendix A 60 ...
Страница 80: ...Appendix B 66 ...