Installation - 7
Ins
ta
lla
ti
o
n
ramp. Move the bay to approximately where it will
be placed during installation.
6.
Staging
— Organize all materials in the installation
area. Prior to beginning installation, find the box
with the foot pads and spacers These should be
marked, but would be in the box with the part
number E7200-80024.
7.
Clear Packaging
— Remove all packing materials,
straps, padding etc. from the installation area.
8.
Inspect Items Shipped
— Inspect the shipment for
damage. Inspect system exterior for abrasions or
dents. Record any damage on the waybill. Advise
the carrier and contact
SPT Manufacturing
immediately.
9.
Move 5DX To Install Site
— When the system has
been delivered to the install area, move it to the
desired placement location. Position the system
according to the customer’s requirements then
install the stabilizer pads with spacers for the
estimated height requirement. (
). The pads
and spacers can be put on while this system is
elevated by the fork lift or the system can be lowered
on to the pads and spacers.
TABLE 2
Spacer Size Reference
Spacer
In Centimeters
In Inches
Quantity
Spacer A (E7200-24715)
1.6 cm
0.630 in.
4
Spacer B (E7200-24717)
3.175 cm
1.25 in.
8
Spacer C (E7200-24716)
7.6 cm
3.0 in.
4
Содержание 5DX II Series
Страница 4: ... iv ...
Страница 14: ......
Страница 57: ...Installation 43 Installation INSTALLATION NOTES ...
Страница 58: ...Installation 44 ...
Страница 74: ...Appendix A 60 ...
Страница 80: ...Appendix B 66 ...