Installation - 1
Agilent 5DX Installation Guide
May, 2002
Preparing for 5DX Installation
Reference Documents:
Agilent Electrostatic Discharge Control
(A-5951-1589-1)
5DX Service Guide (E7200-90028)
System Administration Manual (E7200-90032)
Site Preparation Manual (E7200-90035)
Estimated Time:
Two to Three Days (16 - 24 Hours)
Prerequisite:
All System Components and Software have been
delivered and an acceptable site has been chosen
for installation. All utilities (air, electric, etc.) are
ready for the installation and are at the site of
installation as specified in the Site Preparation
Manual.
Special Notes:
CE must be present for crate unloading, system
movement, system uncrating and system
placement. (whenever possible)
ATTENTION
Static sensitive devices are present. Follow the Agilent
approved ESD handling procedures while working with
static sensitive components.
Installation
Содержание 5DX II Series
Страница 4: ... iv ...
Страница 14: ......
Страница 57: ...Installation 43 Installation INSTALLATION NOTES ...
Страница 58: ...Installation 44 ...
Страница 74: ...Appendix A 60 ...
Страница 80: ...Appendix B 66 ...