Installation - 37
Ins
ta
lla
ti
o
n
h.
Perform a final quick survey of the 5DX Main
Cabinet.
Leakage must be less than Ø.15 mRems/hr.
i.
Complete a formal on-site radiation survey. Use
Document Number 5021-1979. (A sample is
appended to this document.)
j.
From the DOS prompt type
auto
and press
Enter.
7.
Laminography Imaging Validation
— To verify
that laminographic imaging is functioning properly,
perform the following steps:
a.
From the
AutoUI
menu, go to the
Utilities Menu
and select
Load Panel Program
. Select
4picalibxxx/sub
from the pick list.
b.
From the
Utilities Menu
select
Panel Handling
then choose
Automatic
, when prompted load the
calibration board/coupon.
c.
From the
System Access Menu
, select
Quit from
5DX
. At the DOS prompt type
gotocal
-dots
and
press
Enter
.
d.
Type
loadsync -f400 -b1
and press
Enter
.
e.
Type
sync
-e
and press
Enter
.
f.
Use the mouse pointer to select the camera icon on
the graphic display window. Switch the display to
Live Laminography:
{
.
g.
Verify that the
5 dot
calibration pattern is visible on
the graphic display window.
NOTE
Some adjustment of the
Z Axis
may be required.
h.
From the DOS prompt type
auto
and press
Enter
.
8.
Self Test Validation
— To verify that Self Test is
functioning properly, perform the following steps:
Содержание 5DX II Series
Страница 4: ... iv ...
Страница 14: ......
Страница 57: ...Installation 43 Installation INSTALLATION NOTES ...
Страница 58: ...Installation 44 ...
Страница 74: ...Appendix A 60 ...
Страница 80: ...Appendix B 66 ...