
2
Installing 7890/7820/6890/6850 GC Columns
44
5975/5977 Series MSD Operating Manual
To Install the Interface Tip Seal
Materials needed
•
Interface tip seal (G3870-20542)
The interface tip seal must be in place for the EI XTR source and HES.
Procedure
1
Verify that the EI XTR source or HES is installed. This tip seal and its spring
must not be installed when an EI SS or Inert source is installed.
2
Place the tip seal spring over the end of the interface.
3
Remove the interface tip seal from the ion source storage box, and place it
over the end of the interface.
4
Gently
check the alignment of the analyzer and the interface.
CAUTION
Electrostatic discharges to analyzer components are conducted to the side
board where they can damage sensitive components. Wear a grounded
antistatic wrist strap and take other antistatic precautions
before
you open the
analyzer chamber.
Figure 8.
Interface tip seal
Interface
tip seal
Содержание 5975 Series
Страница 1: ...Agilent 5975 5977 MSD for OpenLAB CDS Operating Manual ...
Страница 74: ...3 Intuvo 9000 GC Column Maintenance 74 5975 5977 Series MSD Operating Manual ...
Страница 163: ......
Страница 164: ...www agilent com Agilent Technologies Inc 2019 First Edition January 2019 G7077 90031 G7077 90031 ...