45
7.
Inset the canister holding bracket against the
rear side of the front former and apply CA
glue to the top and bottom where it contacts
the fuse former and fuse floor.
8.
Canister holding bracket shown installed be-
hind front former.
9.
Gather the pre-cut balsa sheeting for closing
off the rear section of the canister tunnel.
10.
Rear former shown where sheeting will be
installed.