27
AeroForce F2B
Installation Instructions
Step 6a
Installing Tarp to Roll Up Bar, Roll Under (Standard)
NOTE:
Hardware taped to roll bar
1) Figure 27-1.
Pull the loose end of the tarp (1) under the roll
up bar, winding from the underside. Make sure the tarp is
centered from side to side.
2)
Mark the tarp roll up bar for fastener placement using the
grommets in the tarp as a guide.
3)
Secure tarp (1) with 1/4-20 pan head Phillips (2), 1/4-20
square nuts (3), and 1/4 split lock washers (4).
Step 6b
Installing Tarp to Roll Up Bar, Roll Over (Optional)
NOTE:
Hardware taped to roll bar
1) Figure 27-2.
Pull the loose end of the tarp (1) over the roll up
bar, winding from the topside. Make sure the tarp is centered
from side to side.
2)
Mark the tarp roll up bar for fastener placement using the
grommets in the tarp as a guide.
3)
Secure tarp (1) with 1/4-20 pan head Phillips (2), 1/4-20
square nuts (3), and 1/4 split lock washers (4).
Index Description
Qty
1
Tarp
1
2
1/4-20 x 1/2 Pan Head
6
Index Description
Qty
3
1/4 Square Nut
6
4
1/4 Split Lock Washer
6
Index Description
Qty
1
Tarp
1
2
1/4 Pan Head
6
Index Description
Qty
3
1/4 Square Nut
6
4
1/4 Split Lock Washer
6
Winding
Direction
Tarp Eyelet
Tarp Roll Up Bar
Driver’s Side End View
4
2
3
1
Figure 27-2
Winding
Direction
Tarp Eyelet
Tarp Roll Up Bar
Driver’s Side End View
4
2
3
1
Figure 27-1
Содержание AeroForce F2B
Страница 19: ...19 AeroForce F2B Installation Instructions Step 4d cont ...
Страница 29: ...29 AeroForce F2B ...