Fusion Installation Procedures
7-28
InterReach Fusion Installation, Operation, and Reference Manual
CONFIDENTIAL
D-620610-0-20 Rev D
Figure 7-18
Installing Directly to the Wall
NOTE:
Leave the dust caps on the fiber ports until you are ready to connect the fiber
optic cables.
Installing an Optional Cable Manager in the Rack
• Using the screws provided, fasten the cable manager to the rack, immediately
above or below the Expansion Hub.
Powering On the Expansion Hub
1.
Connect the AC or DC power as explained in “Making Power Connections” on
page 7-18.
Содержание InterReach Fusion
Страница 8: ...CONFIDENTIAL 6 InterReach Fusion Installation Operation and Reference Manual D 620610 0 20 Rev D...
Страница 12: ...CONFIDENTIAL 4 InterReach Fusion Installation Operation and Reference Manual D 620610 0 20 Rev D...
Страница 16: ...CONFIDENTIAL 4 InterReach Fusion Installation Operation and Reference Manual D 620610 0 20 Rev D...
Страница 205: ...Help Hot Line U S only 1 800 530 9960 A 3 D 620610 0 20 Rev D CONFIDENTIAL Figure A 2 CommScope 2279V for RG 6...
Страница 214: ...A 12 InterReach Fusion Installation Operation and Reference Manual CONFIDENTIAL D 620610 0 20 Rev D...
Страница 238: ...C 20 InterReach Fusion Installation Operation and Reference Manual CONFIDENTIAL D 620610 0 20 Rev D...