A.07.370e - Edition 2.0
Installation
6.3.2
Required meters
- True RMS Multimeter;
- Isolating measurement transformer;
- Insulation tester "Megger" 5000 V and 10000 V;
- AC True RMS measurement device (obey ICAO part 5 § 3.9.4.7).
6.3.3
Required tools
- A standard electrical and mechanical tool kit.
6.3.4
Required cables
- Remote control cable N x 0.8 mm diameter (between the equipment and the control panel)
- Earthing wire
- Input supply cable
- Series circuit cable
6.4 Inspection
1. Carry out a general inspection. See § 4.1.
2. Examine if the inner side of the equipment is not damaged.
3. Examine the transformers for displacement or bending.
4. If you see damage, displacement or bending, tell the carrier immediately.
6.5 Switch OFF the power supply
1. Set the manual switch (A) to the OFF position.
2. Open the main switch on the main distribution board.
3. Disconnect the equipment from the series circuit.
CAUTION
The output voltage of the 30 kVA / 6.6 A equipment can reach approximately 4600 V at full
load.
CAUTION
The current regulation is +/- 1%. To make an acceptable readjustment of the output
current, the precision of the meter should be better than
0.5% for the adjusted value.
A
Содержание CRE 10
Страница 1: ...A 07 370e Edition 2 0 Installation Manual Constant Current Regulator Type CRE ...
Страница 14: ...14 A 07 370e Edition 2 0 Safety ...
Страница 44: ...44 A 07 370e Edition 2 0 Inspection and transport ...
Страница 64: ...64 A 07 370e Edition 2 0 Installation ...
Страница 85: ...A 07 370e Edition 2 0 85 Technical data ...
Страница 86: ...adbsafegate com ...