Inspection and transport
4.4 Transport the unpacked equipment
4.4.1
Transport the equipment with lifting lugs
You can lift all equipment configurations when you take into account these rules:
- Always use lifting lugs (option) and adequate hoisting cables to lift the load. If required, remove the side
panels from the equipment before you lift it.
- Do not let the load swing without control.
- The top panel (roof) of the equipment must be installed.
- Use the correct type of eye bolt. Suppliers of eye bolts provide data on configurations and maximum
allowed load for different types of eye bolts. Use a rotation eye bolt to cover all applications with the same
eye bolt type.
Prepare
1. Remove the bolts (A).
2. Install the lifting lugs (B).
Transport
1. Secure a chain or a rope (A) to the lifting lugs.
2. Slightly lift the equiumipment.
The cables tighten.
3. Carefully move the equipment to the applicable location.
Note
Contact ADB Safegate for the correct eye bolt type.
B
A
A
Содержание CRE 10
Страница 1: ...A 07 370e Edition 2 0 Installation Manual Constant Current Regulator Type CRE ...
Страница 14: ...14 A 07 370e Edition 2 0 Safety ...
Страница 44: ...44 A 07 370e Edition 2 0 Inspection and transport ...
Страница 64: ...64 A 07 370e Edition 2 0 Installation ...
Страница 85: ...A 07 370e Edition 2 0 85 Technical data ...
Страница 86: ...adbsafegate com ...